Laserfiche WebLink
PROJECT: Municioal WeTl No. 3 16" <br />PT.ACE! Orono. Minnesota <br />Prmliirt ion Well PAYMENT NO.;A • <br />FILE NO. :139A9 <br />rnNTRArTORs Kpvs Well Drilling Company DATE:AUKUSt 1. 1990 <br />% <br />STATEMENT OF WORK <br />Unit Est' d Quantity Amount <br />Contract Item Unit Price Quantity To Date To Date <br />RTD II - 16 INCH PRODUCTION WELL <br />Item 1 <br />Mobilization, transporting of materials <br />k equipment & setting up same for <br />constru tion of 16* production well L.S.$6,000.00 L S 0.5 $3,000.00 <br />Item 2 <br />Drill open hole into top of Limestone <br />to set 16" production well casing L.F.35.00 315 310 10,850.00 <br />Item 3 <br />Place 16" casing in open hole L.F.32.00 315 312 9,98A.OO <br />Item 4 <br />Place neat cement grout in annulas <br />around 16* production well casing C.Y.200.00 20 2A A,800.00 <br />Item 5 <br />Drill 16" open hole through <br />the Limestone and Jordan L.F.25.00 160 190 A,750.00 <br />Item 6 <br />Dynamite for blasting incl. labor for <br />shooting, caps & wire Lbs.2.00 300 AO 80.00 <br />Item 7 <br />Bail C.Y.AO.00 AOO 3A0 13,600.00 <br />Item 8 <br />Furnish, install k remove air compression <br />equipt. for air surging of the well L.S.1,000.00 L S 1 1,000.00 <br />Item 9 <br />Air surging of the well lirs.100.00 AO 30.5 3,050.00 <br />Item 10 <br />Furnish, install, ( remove test pump <br />for capacity teat of well L.S.2,500.00 L S <br />PR13949 <br />Page 1