My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-13-1990 Council Packet
Orono
>
City Council
>
1990
>
08-13-1990 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/26/2024 1:32:05 PM
Creation date
11/26/2024 1:29:09 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
724
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
TO: Mark E. Bernhardson, City Administrator <br />From: John R. Gerhardson, Public Director <br />Date: August 8, 1990 <br />Subject: Pur.if^iiouse Bid Award - Well #3, Highway 12 Sewer & Water <br />The City of Orono advertised for and received bids to <br />construct a veil pump house for Well #3 Highway 12 Sewer and <br />'Wat-^r improvement area. <br />The bias were opened on July 13r 1990 at 10:00 a.m. Four <br />bids were received (see attached schedule). The lowest <br />responsible bidder was Richmar Construction Company, Fridley, Mn <br />at a base bid :f d,440 (Engineering estimate $233,900). <br />Richmar is an ei: . blished company and has constructed several <br />similar facilities. <br />The bid allowed for an option on the roof material fnr the <br />mansard roof. The base bid required wood shake shingles. The <br />alternate bid for preformed metal in place of the wood shingles <br />increased the bid by $2,900. The pref^rme'^ metal requires less <br />maintenance. <br />Recommendation To award the b. ^ Well Pumphouse for <br />Well #3 to Richmar Construction Compa*i> an amount of $211,340 <br />which price includes ‘ le option of a preroi.med metal roof for the <br />mans'rc' rooi in pla<~* of the wood shake shingles <br />Proposed Motion Moved 2nd to award the bid for <br />the Well Pumphouse tor Well #3 tc Richmar Construction Company <br />for ar amount of $211,340 which price includes the option of the <br />prefcr.v^d metal roof for the mansard roof in place of the wood <br />shake shingles. <br />Idv <br />or and City Council <br />4ark E. Bernhardson, City Administratoi|- <br />r <br />u ac ">mmending approval.
The URL can be used to link to this page
Your browser does not support the video tag.