My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11-19-2024 Planning Commission Packet
Orono
>
Planning Commission
>
2024
>
11-19-2024 Planning Commission Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 12:17:31 PM
Creation date
11/19/2024 12:08:22 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
302
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Date Application Received: 10/23/2024 <br />Date Application Considered as Complete: 11/05/2024 <br />60-Day Review Period Expires: 01/04/2025 <br /> <br /> <br />To: Chair Bollis and Planning Commission Members <br /> Adam Edwards, City Administrator <br /> <br />From: Matthew Karney, Planner <br /> <br />Date: 18 November 2024 <br /> <br />Subject: #LA24-000058, Tim Brown, PHI Decks,975 Wildhurst Trail, Variances – Public <br />Hearing <br /> <br /> <br />Background <br />The applicant proposes a two-level deck/porch addition (“deck addition”) that includes extension of <br />an existing Juliet-style deck over a newly expanded and enclosed lower deck area, within 75’ of the <br />Ordinary High Water Level (OHWL). Stairs are proposed from the upper level to the yard, but a portion <br />of the deck that wraps around the house on the north side will be removed, lowering the hardcover <br />of the deck by approximately 18 square feet (s.f.). Due to the property’s location as a corner-lake lot, <br />all improvements on this lot will be impacted by the Average Lakeshore Setback (ALS) set by the <br />adjacent home sites. <br /> <br />Practical Difficulties Analysis <br />Applicant Submittal Information: <br />The applicant has indicated that there are practical difficulties affecting the property. The existing <br />residence and decks are severely impacted by the lot’s size and configuration, making it difficult to <br />improve existing conditions without relief. The proposal does involve increasing the massing of the <br />existing residence, by enclosing the lower deck as a porch, but allows the owners to get more <br />beneficial use of their property while not encroaching further lakeward. <br /> <br />Planning Staff Practical Difficulty Analysis: <br />The existing decks are located within the 75’ lakeshore setback, roughly 49 feet from the OHWL, and <br />all improvements of the lot are within the ALS, severely limiting the ability of the property owner to <br />develop their property without needing relief from the Zoning Regulations. The enclosure of the lower <br />deck by extending the upper deck will increase the building footprint, but the structural coverage will <br />be approximately 10%, where up to 20% is allowed. Staff views the unique characteristics of the <br />property as a practical difficulty, with the overall reduction of hardcover as a sufficient offset for the <br />increase in structural massing with the enclosure of the lower deck. <br /> <br />LOT ANALYSIS WORKSHEET <br /> <br />Section 78-305 & 78-1279 – Setbacks: <br /> <br />LR-1B Required Existing Proposed <br />Interior Side (West) 10’ 15’ Existing Home No Change <br />Interior Side (South) 10’ 16.3’ Existing Home No Change <br />Application Summary: The applicant requests 75-foot lake setback and average lakeshore <br />setback variances for a new two-level deck/porch addition, and new hardcover within 75 feet <br />of the OHWL. <br />Staff Recommendation: Planning Department Staff recommends approval. <br />68
The URL can be used to link to this page
Your browser does not support the video tag.