My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11-19-2024 Planning Commission Packet
Orono
>
Planning Commission
>
2024
>
11-19-2024 Planning Commission Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 12:17:31 PM
Creation date
11/19/2024 12:08:22 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
302
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />• SWMP Narrative notes a proposed impervious of 85,746 sf (1.97 acres) but HydroCAD <br />modeling notes an impervious area of 2.38 acres. Please correct so it is consistent and <br />ensure new homes entire impervious is considered. <br />• Please clarify the existing and proposed conditions for the connection between Wetland <br />1 and Wetland 2. <br />• Delineate full drainage area of Wetland 1 so that culverts can be sized appropriately. <br />Culverts must retain adequate hydraulic capacity. A project in a watercourse may not <br />increase upstream or downstream flood stage. <br /> <br />Procedural Requirements <br />Public Notice <br />Once your application is conditionally approved, District rules require that a public notice to be sent to <br />all properties within 600 feet of the subject property. The public notice includes a 14-day comment <br />period allowing members of the public to receive further information and/or request a public hearing. <br /> <br />Fees <br />Permit fees include a $10 application fee, a public notice mailing fee, and any engineering or legal fees <br />incurred during the review process. Financial assurance totals will be calculated at the end of the review <br />process. <br /> <br />Maintenance Instrument <br />The Project will be required to complete a maintenance declaration for the wetland buffers, waterbody <br />crossings, and stormwater facilities. <br /> <br />Permit Timeline <br />Under Minnesota Statutes 15.99, MCWD staff have 15 business days to review and respond to permit <br />applications and inquiries. Staff will review submitted materials and communicate with the applicant <br />and property owner of the status. <br /> <br /> <br /> <br /> <br />216
The URL can be used to link to this page
Your browser does not support the video tag.