My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11-19-2024 Planning Commission Packet
Orono
>
Planning Commission
>
2024
>
11-19-2024 Planning Commission Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 12:17:31 PM
Creation date
11/19/2024 12:08:22 PM
Metadata
Jump to thumbnail
< previous set
next set >
Text box
ID:
1
Creator:
Katie Fitzsimmons
Created:
11/19/2024 12:14 PM
Modified:
11/19/2024 12:14 PM
Text:
PC Exhibit K
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
302
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
BWSR NOD Form – November 12, 2019 1 <br /> <br />Minnesota Wetland Conservation Act <br />Notice of Decision <br />Local Government Unit: Minnehaha Creek Watershed District County: Hennepin <br />Applicant Name: Brad and Carol Pass Applicant Representative: Ken Arndt (MRN) <br />Project Name: 215 North Arm Lane LGU Project No. (if any): W24‐010 <br />Date Complete Application Received by LGU: 04/16/2024 <br />Date of LGU Decision: 06/17/2024 <br />Date this Notice was Sent: 06/17/2024 <br /> <br />WCA Decision Type ‐ check all that apply <br />☒ Wetland Boundary/Type ☐ Sequencing ☐ Replacement Plan ☐ Bank Plan (not credit purchase) <br />☐ No‐Loss (8420.0415) ☐ Exemption (8420.0420) <br /> Part: ☐ A ☐ B ☐ C ☐ D ☐ E ☐ F ☐ G ☐ H Subpart: ☐ 2 ☐ 3 ☐ 4 ☐ 5 ☐ 6 ☐ 7 ☐ 8 ☐ 9 <br /> <br />Replacement Plan Impacts (replacement plan decisions only) <br />Total WCA Wetland Impact Area: <br />Wetland Replacement Type: ☐ Project Specific Credits: <br /> ☐ Bank Credits: <br />Bank Account Number(s): <br /> <br />Technical Evaluation Panel Findings and Recommendations (attach if any) <br />☐ Approve ☐ Approve w/Conditions ☐ Deny ☒ No TEP Recommendation <br /> <br />LGU Decision <br />☒ Approved with Conditions (specify below)1 ☐ Approved1 ☐ Denied <br /> List Conditions: <br />1. Any impacts to the wetlands will require additional permitting (WCA sequencing/replacement/bank and <br />MCWD permits). <br />2. Must comply with all applicable local, state, and federal laws, regulations, and ordinances. <br /> <br />Decision‐Maker for this Application: ☒ Staff ☐ Governing Board/Council ☐ Other: <br /> <br />Decision is valid for: ☒ 5 years (default) ☐ Other (specify): <br /> <br />1 Wetland Replacement Plan approval is not valid until BWSR confirms the withdrawal of any required wetland bank credits. For project‐ <br />specific replacement a financial assurance per MN Rule 8420.0522, Subp. 9 and evidence that all required forms have been recorded on <br />the title of the property on which the replacement wetland is located must be provided to the LGU for the approval to be valid. <br /> <br />LGU Findings – Attach document(s) and/or insert narrative providing the basis for the LGU decision1. <br />☐ Attachment(s) (specify): <br />☒ Summary: <br />The TEP (Maggie Menden/Trey Jonas (MCWD) and Jed Chesnut (BWSR) met on‐site with the applicant <br />representative (Ken Arndt) on 5/21. The TEP provided comments on the delineation and asked that the report <br />be updated. These comments consisted of connecting the channel between wetland 1 and wetland 2, as well <br />as a slight change in the NW corner of wetland 2. The updated and approved delineation report is attached <br />(Updated 6/10/2024). <br />1 Findings must consider any TEP recommendations. <br /> <br />170
The URL can be used to link to this page
Your browser does not support the video tag.