Laserfiche WebLink
D)test other areas of the property to install some <br />type of system suitable and acceptable to the City <br />which would, although perhaps not totally meeting code <br />standards, at least not result in a potential for <br />contamination of neighboring wells or disturbance of <br />neighboring properties. <br />3.Prior to issuance of a building permit, the applicant <br />shall sign a formal waiver of assessment appeal rights for <br />the reasonable share of costs to provide municipal sewer to <br />the property as part of any forthcoming sewer project. <br />4.The Council is approving this variance based upon the <br />applicant's control and eventual fee ownership of both Lots <br />4 and 5,A condition of this variance is that at such time <br />that applicant is fee owner of Lots 4 and 5, such lots shall <br />be legally combined for tax purposes.The current fee <br />owners of each lot, in signing and agreeing to the terms of <br />this resolution, acknowledge the City's intent that the lots <br />be combined, and the owner of Lot 4 is placed on notice that <br />should such combination not occur, the City is under no <br />obligation to allow separate residential use of Lot 4. <br />5.The structure on Lot 4 shall remain merely as a storage <br />building, shall not be provided with plumbing, and shall not <br />serve as a second dwelling unit on the property, except that <br />this condition does not preclude a future Council from <br />granting setback or other variances which might be necessary <br />to allow an expansion of the principal structure northward <br />to incorporate the existing accessory building on Lot 4, <br />once the combination of Lots 4 and 5 has occurred. <br />6.Based upon the lot combination, applicant and the fee <br />owners are advised that it is the City's intent to not <br />assign a sewer unit assessment to Lot 4, since the structure <br />on Lot 4 has no plumbing and is intended to serve as a <br />storage structure accessory to the principal structure on <br />Lot 5. However, applicant/owners are hereby advised that in <br />the event that Lot 4 is not legally combined with Lot 5 and <br />construction of a separate residence is at some future date <br />approved for Lot 4, at that time, a full sewer unit <br />connection charge will have to be paid prior to issuance of <br />a building permit for Lot 4. <br />Page 4 of 8