My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-25-1990 Council Packet
Orono
>
City Council
>
1990
>
06-25-1990 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/12/2024 12:21:35 PM
Creation date
11/12/2024 12:14:11 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
563
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
I|l Bonestroo <br />Rosene <br />«|^n Anderlilc & <br />Associates <br />Engineers & Architects <br />CeoQ aenctooa M <br />«o6e« '*/ tec.*w Pf <br />^icpnC A/»a«** »| <br />t PC <br />I V"W P| <br />;«*'« C C w P8 <br />CJcnn • CCW. PS <br />Tuamai I (woyfv »P <br />•oOCfT 0 SrwnKPt PI <br />kun M Saean. C 'A <br />Ke*m A Gown. PI <br />Ptnm NV Penn PC <br />OoAM C Smgjiei PE <br />i*«y A BOiMOA P| <br />M*m A HJAm P| <br />^ea K Pieo. PC <br />wicwi r ligenarA P.C <br />laben » PfWTttte. p| <br />Ojvid O 10(1(9’^ PC <br />TftOffUi W PCtPMfV PI <br />Mctm) r t^n pf <br />Jlffltl« Ml <br />KC'W'Clft P A <br />I Ion <br />caotnC <br />TAOmM f <br />HowjfS a. ! <br />0>n<ei jL So <br />Man A Sev <br />P"»i0 J Cll <br />ivnw MaTi <br />Mar* 0 VM <br />Mj <br />Junt 21, 1990 <br />City of Ocono <br />Box 66 <br />Crystal Bay, MN 55323 <br />Attn< Hark Btmhardson <br />Re I 13901 TH 12 Corridor Planning <br />Consultant Engineer <br />Dear Markt <br />Ve have reviewed the "Draft Request for Proposal" for transportation planning <br />and developaent relative to the TH 12 corridor location. The outline is <br />excellent in listing qualifications necessary for selecting someone to <br />complete a corridor study. Mn/DOT will be doing the study and has selected a <br />consultant that meets the criteria established. <br />The "coinmuni:y transportation planning" section is appropriate. The City has <br />great concerns as to the manner in which the selected corridor affects local <br />transportation. This would be relative to access to the corridor and the <br />traffic impact on the existing street network. <br />The "Highway 12 corridor selection" process is outlined adequately. The <br />location of this corridor is the major issue because of its pote.-jial impacts <br />on Orono residents. The local community has to balance the transportation <br />need with land use and minimize the impact on its citizens. <br />The criteria for selection of the consultant is identified in two parts. Part <br />•A" deals with the needs of the City and seems appropriate for the selection. <br />Pert "B" is generally related to experience on previous corridor studies and <br />should not carry as much weight in the selection process. <br />The most important qualifications of the consultant should be fimllarity with <br />the community and local transportation planning. An understanding of the <br />Mn/DOT study process is all that is required to ensure that the City's <br />interests will be represented. <br />BRA would be able to meet the selection critera for Part "A". Ve have not <br />been employed by Mn/DOT to conduct a corridor study so we would not. for the <br />most part, meet all of the criteria outlined in Part "8". But Cary Rylandcr <br />and I have a great deal of expedrience working with M&.'DOT and ve are very <br />well acquanted with the process. In fact, we have wc»rf.tj4 • .osely with Chaska <br />officials on representing their interests regarding new T.M. 212.
The URL can be used to link to this page
Your browser does not support the video tag.