Laserfiche WebLink
� , <br /> - . <br /> �Michael Gaffron Re:StoneBay PUD Modification <br /> ' Page 2 October 20,2004 <br /> 2. Eave Overhangs. Our envelope lots for this development were intended to <br /> enclose the building footprint, and allow for eave overhangs. Unfortunately, it <br /> was recently brought to our attention that your ordinance allows 1.5-foot <br /> overhangs to encroach into the setback requirement, not 2 feet as proposed on <br /> � our units. Due to the setback issue described above, our eaves encroach into <br /> the setback beyond what is typically permitted. However, we believe that this <br /> encroachment is consistent with the intent of the PUD for StoneBay and request <br /> PUD flexibility to allow this encroachment. <br /> 3. Structural overhangs. We have a bump out proposed on Lot 6, Block 1 which <br /> also encroaches 1.5-feet into the setback. While we understood that this <br /> encroachment was similar to an allowed encroachment for a bay window, we <br /> now understand that because the cantilever is from floor to ceiling on the main <br /> level, it would not be allowed to encroach into the setback even though it does <br /> not include an extension of the foundation. The City has approved similar <br /> cantilevers in other portions of the project, but these elements have never <br /> created a setback issue. This is a unique circumstance due to the envelope lot <br /> setback; therefore, we are requesting flexibility to allow this encroachment for Lot <br /> 6, Block 1. Unfortunately, this lot has been restricted beyond the limits of other <br /> lots in the PUD due to the error in the setback. We believe that while the <br /> cantilever does not meet the letter of the law, it does meet the spirit and intent af <br /> the ordinance and we ask that you provide setback flexibility for this homeowner. <br /> We are very excited about the StoneBay project and believe that the project is a <br /> wonderful addition to the City of Orono. The wetlands, approved building designs and <br /> approved lot layout, create constraints that are unique to Lot 6. However, we believe <br /> the requested flexibility is indistinguishable to surrounding properties and does not <br /> diminish the spirit of the StoneBay PUD approvals. <br /> Therefore, we request approval of these modifications to the approved RPUD General Plan <br /> based pm the finding that they are generally consistent with StoneBay approvals and would <br /> have no impact on surrounding properties. If you have any questions or comments, <br /> please contact me or Steve Johnston at 612.252.9070. <br /> Sincerely, <br /> LANDFORM* <br /> ��- l�l�l ) . <br /> Kendra Lindahl, AICP <br /> Principal Planner <br /> COPY: John Hassler, John Terrance Homes, LLC <br /> 'Landform Engineering Company doing business as Landform <br /> 650 BUTLER NORTH BUILDING 510 FIRST AVENUE NORTH MINNEAPOLIS,MN 55403 <br /> OFFICE: 612.252.9070 FAX:612.252.9077 wv�nN.landform.net <br />