My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-23-1990 Council Packet
Orono
>
City Council
>
1990
>
04-23-1990 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/22/2024 11:54:57 AM
Creation date
10/22/2024 11:54:22 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
266
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Cityof OROrVO <br />RESOLUTION OF THE CITY COUNCIL <br />OF <br />ORONO <br />NO.2692 <br />rhe proposed plan satisfies the objectives of the <br />Transportation Plan of Comprehensive Plan Amendment No. <br />2 as applicant has provided dedication of access for <br />Highway 12 and a road outlot to serve as an east/west <br />frontage road. <br />C) Municipal sanitary sewer and water has been ordered <br />to serve the property. <br />D) Applicant has provided detention areas on the site <br />and will provide more detailed drainage plans upon <br />approval of the general concept stage and as a <br />requirement of the final development stage of the PUD <br />rezoning. <br />E) The PUD zoning and format of development is <br />preferred within the Highway 12 Corridor. <br />F) The exterior of commercial building proposed for <br />Lot 1 of the commercial subdivision shall be of a <br />combination of tan and dark brown concrete blocks with <br />split-face stone finish with trim of dark brown and <br />green to match annodized aluminum with clear glazing <br />used through area where plant materials are maintained. <br />All accessory structures shall be of the same exterior <br />finish and exterior colors. <br />G) Applicant shall enter into a Development Agreement <br />with the City to specify timing of all improvements <br />associated with the development and developer s <br />financial commitments related to those improvements. <br />3. The residential portion of the subdivision application <br />involves a lot line rearrangement of existing residential <br />lots. Each of the newly rearranged lots satisfies the area <br />and lot width standards finding that each lot can continue <br />to be used for residential use and future construction <br />without the need of further variances. <br />4. The proposed vacation of Pine Ridge Lane is consistent <br />with the directives of Comprehensive Plan Amendment No. 2 as <br />the applicant has dedicated a road outlot through tha <br />commercial portion of the property for an east/west frontage <br />road. <br />Page 2 of 7
The URL can be used to link to this page
Your browser does not support the video tag.