My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-23-1990 Council Packet
Orono
>
City Council
>
1990
>
04-23-1990 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/22/2024 11:54:57 AM
Creation date
10/22/2024 11:54:22 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
266
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
KniMlK KUAbnl b' liL ILL no .Li idr lOido 9:<ji NO.out r.u« <br />taulC Rotwft <br />JDtwM lto«<« <br />0. •vadtom <br />MncaA.Maiorw/ <br />DovWS BoM <br />IwwriM J. taO* <br />RAIWIK. ROSZAK. BERGSTROM. MALONEY k BARTH, P.A. <br />AtlornByi at low <br />300 PKMBtr Bul(*^ <br />730 Second Av»nu» South <br />Minneapolis. Minnesota SS4Q2 <br />vn»r wme <br />SumLTatpinons <br />ICSolnjRupp <br />Je^t »ouSw <br />OolwC Otoon <br />(612)339.0060 <br />FAX (612) 3390038 <br />Harch 16, 1990 <br />•ABO AdmlNM In MKorwn <br />.1 AIK> AdnriMM m South OMMa <br />Dr. Thonaa Mich, Superintendent <br />Independent School District No. 278 <br />685 Old Crystal Bay Road <br />Long Lake, HN 55356 <br />Electrical Bids, Pool and Classroon Addition <br />Our Pile No. 278-0007 <br />Dear Dr. Mich: <br />We have reviewed the March 7, 1990, letter of Gerald A. <br />Wagoner, president of Ridgedale Electric, Inc., in which Mr. <br />Wagoner states that the school district's construction manager <br />reguested that hie company, as well as Langford Electric, submit <br />revised pricing estimates for the electrical work on the <br />and <br />classroom and swimming pool addition after sealed competitiv <br />bids of the contractors were received by the school district <br />had been opened. We have, additionally, discussed Mr. Wagoner's <br />letter with Ronald A. Christenson, the construction manager. <br />As you are aware, the base bid of Langford Electric of <br />$263,610.00 was lower than that of Ridgedale by approximately <br />$5,000.00. When alternates E-6 (Whirlpool Connections) and E-8 <br />(Relocate Electrical Service) were taken into account, however, <br />Ridgedale's bid of $259,025.00 became the lower of the two bv <br />approximately $3,000.00. <br />It becomes apparent that with a difference between the base <br />bids of only two percent and in view of the fact that the <br />alternates reduced that difference to an even smaller percentage <br />Mr. Christenson was attempting, although without authorisation <br />by the School Board, to determine if there were circumstances <br />under which the difference could be reduced even further.
The URL can be used to link to this page
Your browser does not support the video tag.