Laserfiche WebLink
I <br />I <br />i <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />D <br />0 <br />I <br />I <br />I <br />I <br />a <br />APPENDIX A <br />Old Crystal Bay Road <br />Sanitary Sewer Force Main <br />Alternate I <br />8" Force Main to Metro Station <br />Lift Station at Railroad Tracks <br />Part K - Gravity Sewer (Point C to Point E) <br />Item Unit <br />Unit <br />Price <br />Estimated <br />Quantity <br />10- <br />10" <br />10* <br />10' <br />10" <br />10" <br />deep <br />deep <br />deep <br />sanitary sewer 0-8' deep <br />sanitary sewer 8-10* deep <br />sanitary sewer 10-12' deep <br />sanitary sewer 12-14' <br />sanitary sewer 14-16' <br />sanitary sewer 16-18' <br />Standard manhole <br />Manhole over depth <br />Cut into existing manhole <br />Improved pipe foundation <br />Mechanical trench compaction <br />Clear and grub trees <br />Seeding with topsoil and mulch <br />Total Estimated <br />+52 Contingency <br />Lin.ft. <br />Lin.ft. <br />Lin.ft. <br />Lin.ft. <br />Lin.ft. <br />Lin.ft. <br />Each <br />Lin.ft. <br />Each <br />Lin.ft. <br />Lin.ft. <br />LUMP SUM <br />Acre <br />Construction <br />$ 14.00 <br />15.00 <br />17.00 <br />20.00 <br />24.00 <br />28.00 <br />1,000.00 <br />100.00 <br />300.00 <br />2.00 <br />1.00 <br />5,000.00 <br />2,500.00 <br />Cost <br />+ 152 Legal, Engrng. & Administration <br />+ 82 Capitalized Interest <br />Total Estimated Cost - <br />Part A - Gravity Sewer <br />-9 - <br />13952R <br />960 <br />755 <br />420 <br />670 <br />30 <br />10 <br />10 <br />26 <br />2 <br />3,000 <br />2,845 <br />LS <br />3.0 <br />Estimated <br />Cost _ _ <br />13.440.00 <br />11.325.00 <br />7.140.00 <br />13.400.00 <br />720.00 <br />280.00 <br />10,000.00 <br />2.600.00 <br />600.00 <br />6,000.00 <br />2.845.00 <br />5,000.00 <br />7.500.00 <br />$ 80,850.00 <br />4.040.00 <br />$ 84,890.00 <br />12.735.00 <br />$ 97,625.00 <br />7.810.00 <br />$105,435.00