My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-09-1990 Council Packet
Orono
>
City Council
>
1990
>
04-09-1990 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/18/2024 2:20:56 PM
Creation date
10/18/2024 2:18:58 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
457
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Box 385 Soring Park MN 55384 <br />612-471-8809 <br />FEBRUARY 22, 1990 <br />CITY OF ORONO <br />.^0 BOX 66 <br />Crystal bay, mn. 55323 <br />‘ATTN: JEANNE MABUSTH <br />RE: Zoning file #1478 <br />3572 Shoreline Dr. <br />Jeanne: <br />1) Signage: One 4'x8' sign installed in existing 4"x4" post located <br />10' from property right of way (photo's enclosed and permit is <br />applied for. <br />2) Lighting: To remain the same. <br />3) Landscaping: Add trees to front of building by sign and one tree <br />at the rear property line, (see site plan) <br />4) Approved parking: Two stalls in front, five stalls in the rear <br />including garage, (see new site plan) Would like to leave black <br />top in front in ease of backing up so client can drive forward <br />to Shoreline Dr instead of backing out and creating a traffic <br />hazard. Extend blacktop in rear of building to required length <br />of parking stall, (see site plan) <br />5) Drainage: According to survey drainage is no problem. <br />6) Exterior of building: Installing new deck (by April 15th, 1990) <br />to meet code. Plan to install new siding in the spring of 1990 <br />if money permits, otherwise we will paint the building light to <br />medium gray with white trim and shutters. The roof appears to be <br />in very good shape approx. 5-6 years old. <br />A new Mechanical system and proper Electrical service has already <br />been completed. All Landscaping and Driveway improvements will be <br />made as soon as weather permits. The shed in the rear will be re <br />moved by April 1, 1990. <br />Thank you for your cooperation and any comments would be appreciated <br />Sincerely, <br />Robert J. Ritchie
The URL can be used to link to this page
Your browser does not support the video tag.