My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1983-10-25 Developer Sewer Agreement Pg1
Orono
>
Property Files
>
Street Address
>
C
>
Carman Street
>
2480 Carman Street - 20-117-23-12-0028
>
Land Use
>
1983-10-25 Developer Sewer Agreement Pg1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/17/2024 10:39:41 AM
Creation date
10/17/2024 10:35:15 AM
Metadata
Fields
Template:
x Address Old
House Number
2480
Street Name
Carman
Street Type
Street
Address
2480 Carman Street
PIN
2011723120028
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
g) The City Engineer shall inspect the work during construction and <br />the Developer and their contractor in return for the above <br />reimbursement shall and hereby do agree to abide by the City <br />Engineer's directions regarding installation and construction <br />practices. <br />h) Prior to final acceptance by the City, the Developer shall provide <br />to the Ci ty a permanent ut i 1 i ty easement over,, on, across, and under <br />that portion of their property within which will exist the City - <br />owned portion of the proposed system, in a form approved by the City <br />Attorney. <br />i) The Developers hereby agree to deed, grant and gift to the City, and <br />the City hereby agrees to accept and to thereafter maintain and <br />operate upon completion and final acceptance of the project by the <br />City that part of the project in the public right of way or easement <br />coe,i.,t-ir.r4 of the fnrcemain sewer, the pumping station, and the <br />gravity lateral lines including manholes but excluding individual <br />service stubs or lines to the three properties. <br />j) The Developers shall pay all construction costs and the City shall <br />pay its engineering costs out of the connection charges, there <br />shall be no special assessment for installation of this pro je,•t.. <br />2. Improvements: In accordance with the policies and ordinances of <br />the City, the Developer's above describers public or private improvements <br />(hereinafter collectively called the "Improvements") shall be constructed and <br />installed by the Developer at their cost or, the terms and conditions hereinafter <br />and hereabove contained. <br />3. Construction Plans: The plans and specifications for the complete <br />installation of the Improvements are attached as Exhibit B. The plans and <br />specifications shall conform to all current City standards for all applicable <br />work. <br />4. Construction of Improvements: <br />A. Commencement Date - The construction of Improvements shall begin no <br />later than November 7, 1983 <br />B. Completion Date - All Improvements shall be completed no later than <br />June 1, 1984 . <br />C. Contractors - The Developer shall select, retain and supervise the <br />Contractor(s) responsible for Improvement construction. The <br />City reserves the right to require satisfactory proof of successful <br />experience and adequate financial status of any such contractor. <br />Where required by City ordinance, the cor `ractor shall f irst obtain <br />a license from the City. <br />D. Pre -construction Conference - Prior to the start of any <br />construction, the Developer and the Developer's Contractor shall <br />meet with the responsible City officials to review construction <br />plans and schedules. <br />Page 3 of 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.