My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1983-10-25 Sewer Construction Agreement
Orono
>
Property Files
>
Street Address
>
C
>
Carman Street
>
2474 Carman Street - 20-117-23-12-0027
>
Land Use
>
1983-10-25 Sewer Construction Agreement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/16/2024 1:33:01 PM
Creation date
10/16/2024 1:30:46 PM
Metadata
Fields
Template:
x Address Old
House Number
2474
Street Name
Carman
Street Type
Street
Address
2474 Carman Street
PIN
2011723120027
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
,,! jDRESF : <br />b) Upon completion of the plans and outline specifications and <br />approval thereof by the City Council, five sets of the plans and <br />specifications shall be delivered to the Developer who shall <br />thereafter bid and/or contract with a City -approved, State - <br />licensed plumbing contractor to install the complete system with <br />said Developer's assuming the complete cost thereof, including <br />without limitation all excavation, backfill, electrical <br />connections, restoration, septic tank pumping and abandonment, <br />street opening, tapping, barricades, street restoration and other <br />items necessary for a complete operating system. <br />c) The City shall obtain all required Pollution Control Agency and <br />Metropolitan Waste Control Commission sewer extension permits. <br />The City shall not uc liable for failure to obtain the permits. <br />d) The Developer's licensed contractor shall obtain from the City two <br />sewer connection permits for the two existing residences at 2470 <br />and 2480 Carman Street, which combined permits shall constitute the <br />only City permit required to install the proposed system to and <br />including connection of the existing residences. A third <br />connection permit shall be required whenever a new hou-se is built on <br />the third vacant lot. <br />e) The undersigned owner shall pay to the City all required permit, <br />connection and sewer availability charges prior to issuance of the <br />constructicn permits, as follows: <br />2470 (exist.) 2474 (future) 2480 (exist.) <br />Permit Fee S 20.50 deferred $ 20.50 <br />MWCC/SAC 5425.00 deferred $425.00 <br />Navarre Connection $375.00 deferred $375.00 <br />Unit <br />ADDRESS: <br />$820.50 deferred $820.50 <br />f) Upon payments to the City of the amounts due to the City under the <br />agreement, the City shall reimburse the Developers upon completion <br />and approval of the project by the City, in an amount equal to the <br />estimated cost of providing pumps for gravity sewer service to each <br />property consistent with past City sewer projects, as follows: <br />2470 <br />Amount to be paid $3,500 <br />by City to Developer <br />2474 <br />$3,500 <br />2480 <br />$3,500 <br />In addition, the City shall pay the City's Engineer costs, <br />estimated to be 5900 for each of the units. <br />Page 2 of 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.