My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-26-1990 Countil Packet
Orono
>
City Council
>
1990
>
03-26-1990 Countil Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/14/2024 2:17:06 PM
Creation date
10/14/2024 2:15:38 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
385
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
/-TTAClttiAaJT Cl <br />TO: Mayor Grabsk <br />Orono City Councilmeinbers <br />FROM: Mark E. Bernhardson, City Adninistrat <br />DATS: September 14, 1989 <br />SUBJ: Stubbs Bay Sewer <br />Attachment; Stubbs Bay Sewer Memo-3/17/89 <br />ISSUE - <br />1. Presentation of information to Council related to <br />primary issues raised at the Stubbs Bay Meeting held July 27, <br />1989. <br />2. Establish a date "^or the next Stubbs Bays meeting which <br />would be with interested residents of the area and the Council. <br />INTRODUCTION - <br />At the Council's August 23, 1989 Council Meeting, Attachment <br />A was presented outlining significant issues related to the <br />Stubbs Bay sewer that had been raised at the July Meeting. <br />DISCUSSION - <br />Issue 1♦ - Outline cf Major Issues <br />A. Inclusion of other areas - <br />1. Oxford Road - This area was developed at the 2-acre <br />lakeshore standarci" ilTT978. While sewer could be extended to <br />this area an estimate for this extension has not been made. <br />There are 11 properties in this subdivision and presently there <br />is only one septic system that has had intermittent problems. <br />The Oxford Road' area Is in part lakeshore property and this may <br />have special consideration as to whether or not it is included in <br />the sewer project. <br />2. Sussex Development - This is presently being <br />proposed for development. It is~at a 2-acre density for a total <br />of 17 residential lots. The topography of this area may make it <br />expensive to sewer this area as it would need either a deep <br />gravity line or a lift station line into the Stubbs Bay sewer to <br />feed into the proposed Stubbs Bay system. <br />3. Cygnet Place - This area contains 19 developed lots <br />which are predominately 1/3 - 1 acre. It is an area the City may <br />look at for an alternative waste management study in the next 5 <br />years. Topography may make sewering this area expensive. Also <br />there are another 6 lots in between the Stubbs Bay area and <br />Cygnet that could also be looked at. <br />In order to include any of these in the development, the <br />ity would need to make a request ^USA line extension. <br />• Although the Stubbs Bay area is currently not within the Mu SA
The URL can be used to link to this page
Your browser does not support the video tag.