Laserfiche WebLink
I, Wes Bendickson, submit the following bid to develop the Main Campus <br />site at the Orono Schools to prepare the land for a Little League field. <br />The cost to do the following will not exceed $6,000. If actual costs <br />exceed this I will don^ the remainder: <br />1. Scrape the topsoil and return same at a 4-6" base for the outfield <br />seeding and for the infield area which will be sodded. <br />2. Level the playing surface at a 1-2% grade away from home plate toward <br />the outfield as per LL recommendations. <br />3. Level area in foul territory and approximately 35 feet behind the home <br />plate area. <br />4. Scooping infield to depth of approximately 4-6" to allow for P-rock and <br />aglime, and the installation of this material. <br />5. installation of the tile surrounding the infield, a manhole collector to <br />the east of the left field foul fence and connecting tile to the outfield <br />storm collection system which drains toward Lake Clausen. <br />The bid does not include the cost of the manhole, drain tile, P-rock, <br />aglime, grass seed or sod. Other contruction materials (dugouts, fencing, <br />etc) are likewise not included. <br />If Mr. Bendickson is hired as the contractor he would prefer to start <br />in April. This would also bo a great benefit for the sod and grass seeding. <br />In addition it would enable other construction to begin as early as <br />possible. . ^7 ^ ^ <br />Signed:^^ <br />Date: £>^ <br />/ ' /