Laserfiche WebLink
C) Major Elements to be constructed: <br />- Chain Link fence to enclose field. Fence will be <br />permanent. <br />- Dugouts can be built so that they can be removed at a <br />later date. <br />- Concession Stand/Press Box - probably a 2-story <br />structure. Believe we can build a temporary foundation <br />(i.e, embedded concrete blocks) so that building could <br />be moved in the future. Structure has a main floor <br />concession stand and a second-story "press box". A <br />15' X 20' building would be adequate. <br />- The playing field itself is in place. Grass infield <br />will need to be installed (infield is currently <br />gravel). <br />D. OTHER SITE CONSIDERATIONS <br />- Water is available and would be utilized. <br />- Electricity is on street. Would have to be brought in <br />to Concession Stand. <br />I <br />- Parking is adequate. <br />- Toilet facilities would be "portable" as now exists on <br />site. <br />V. USE OF FIELD <br />A. 1990 - If proposal is approved, work would begin <br />with OBA forces as soon as weather permits. <br />- With maximum organization, we can "throw out <br />the first pitch" on Saturday, June 2, 1990. <br />- Beginning June 2, 1990, use of Holbrook Park <br />will be terminated (actual season begins May <br />5) . Remainder of *:chedule will be played on <br />Wolner Field or Bederwood Field. This <br />schedule will permit minor leagues to use the <br />field also, thus exposing the new facility to <br />use by 250 youth in OBA. <br />- Little League will retain exclusive use of <br />field through mid-July. LL will also have <br />priority on practice times for post-season <br />play through approximately August 10. Minor <br />league will use for post-season tournament <br />finals.