Laserfiche WebLink
A <br />C)Major Elements to be constructed: <br />D. <br />-Chain Link fence to enclose field. Fence will be <br />permanent. <br />-Dugouts can be built so that they can be removed at a <br />later date. <br />Concession Stand/Press Box - probably a 2-story <br />structure. Believe we can build a temporary foundation <br />(i.e, embedded concrete blocks) so that building could <br />be moved in the future. Structure has a main floor <br />concession stand and a second-story "press box". A <br />15* X 20' building would be adequate. <br />The playing field itself is in place. Grass infield <br />will need to be installed (infield is currently <br />gravel). <br />5R SITE CONSIDERATIONS <br />-Water is available and would be utilized. <br />-Electricity is on street. Would have to be brought in <br />to Concession Stand. <br />-Parking is adequate. <br />-Toilet facilities would be "portable" as now exists on <br />site. <br />V.USE OF FIELD <br />A.1990 If proposal is approved, work would begin <br />with OBA forces as soon as weather permits. <br />With maximum organization, we can "throw out <br />the first pitch" on Saturday, June 2, 1990. <br />Beginning June 2, 1990, use of Holbrook Park <br />will be terminated (actual season begins Hay <br />5). Remainder of schedule will be played on <br />Wolner Field or Bederwood Field. This <br />schedule will permit minor leagues to use the <br />field also, thus exposing the new facility to <br />use by 250 youth in OBA. <br />Little League will retain exclusive use of <br />field through mid-July. LL will also have <br />priority on practice times for post-season <br />play through approximately August 10. Minor <br />league will use for post-season tournament <br />finals. <br />1 <br />1 <br />l-l