My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-12-1990 Council Packet
Orono
>
City Council
>
1990
>
03-12-1990 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/8/2024 10:35:23 AM
Creation date
10/8/2024 10:19:51 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
820
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Z0NZM3 PILB HO 1470jniag Adainistratorting FutureLensive Plan' as an allowable lent 3, not subject ys that driveway egulated in cases lessive drivewayprovides private tdential units, a <br />niaum paved width <br />ot for a private <br />idivision 21 (C)]. <br />locuments. <br />opment Intent <br />Plan provide for <br />Ln the rural area <br />)mprehensive Plan <br />Licies). Yet the <br />:ating that, by <br />. lots must front <br />sed to front on <br />of 3/6/36). The <br />of revision. It <br />private roads is <br />s. <br />CITY OP OROMO P.O. Box 66Crystal Bay, MN 55323 HOTICB OP PLANNIHG COMMISSION ACTION473-7357 Date of Notice: 1/17/90TO: Daniel Parten1015 Tonkawa Road Long Lake, MN 55356TYPB OP APPLICATION: Subdivision COPIES TO:DATE OP TING:1/16/90 VOTE: 5 For 0 AgainstPlanning CosBission recosBenda the following:Approval subject to conditions noted belowNOTES AND SPECIAL CONDITIONS:1. Outlet A shall be 50 feet in width and extend from Bayside Road to the east lot line.2. The 20' corridor as shown on the proposal shall be platted as Outlot <br />B. <br />3. The drainage easement traversing Lot 1 to be 15' in width. <br />4. Granting of standard drainage and utility easements along all lot <br />lines, i.e. 10 ’ along perimeter lot lines, 5' either side of the <br />interior lot line between Lots 1 and 2. <br />5. Applicants to grant a standard road and utilities easement over Outlot <br />A subject to a private road covenant to be filed in the chain of title <br />in Lots 1 and 2, providing for private ownership an 1 maintenance of <br />Outlot A. <br />6. The property owners are placed on notice that at some future date that <br />Lot 1 is subdivided to create an additional lot, the City will require <br />upgrading of Outlot A to private road standards. Furthermore, at such <br />time that any other abutting properties are developed that will make a <br />use of Outlot A for access, such development shall trigger the <br />requirement that road be upgraded to City private road standards even <br />if Lot 1 has not been split. <br />7. A turn-around or back-up apron shall be provided for each of Lots 1 <br />and 2 for emergency vehicle access. If such access is provided by a <br />loop driveway, the minimum center line radius of that driveway loop <br />shall be 50', with a minimum 20' driving surface width. <br />8. Because this is a lot line rearrangement, Park Fee for Lot 2 need not <br />be paid until such time that a residence is constructed on Lot 2. <br />9. Drainfield sites have been defined on each of Lots 1 and 2 and the <br />property owners shall protect those sites from any use or disturbance <br />which would render them unusable as sewage treatment sites.
The URL can be used to link to this page
Your browser does not support the video tag.