My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-23-2024 CC Agenda Packet
Orono
>
City Council
>
2024
>
09-23-2024 CC Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/23/2024 2:00:59 PM
Creation date
9/19/2024 5:40:25 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
196
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
HCYAG 6 <br />more variety to combat future issues that occur when planting heavily rely on one or two species. <br />The masterplan addresses the need for additional plantings and varied plantings. <br />-A stormwater pond is designed to be built at the park to help with runoff and cleaning <br />stormwater before entering local waterways <br />2.3 Collaborations and Partnerships <br />1.What entities and organizations will be involved in the proposed project?Describe the <br />role of the Local Government Unit (LGU). If the LGU will be serving as the fiscal agent, <br />provide information about the implementing agency including organizational capacity to <br />implement the project. <br />1-2 paragraphs <br />The main objectives of the project will be completed by the City of Orono and chosen <br />contractor. The city will work with different sports associations (listed below) to introduce <br />additional amenities for their corresponding sports. The city will partner with the different <br />organizations to provide amenities such as dugouts, seating, storage, nets/goals, bases, etc. We <br />see this project as a collaborative effort and welcome all users of the park to partner with the <br />city. <br />2.4 Implementation Timeline <br />1.Include a proposed timeline for project implementation and grant fund usage. <br />Submital of Grant Application to Hennepin County Youth Activities Grant September 2024 <br />Approval of Application by Hennepin County December 2024 <br />Engineering and Final Design March 2025 <br />Authorization to Advertise for Bids by City of Orono April 2025 <br />Receive and Approve Bids May 2025 <br />Construction Starts May 2026 <br />Contruction Completed August 2026 <br />Park Reopened for Use September 2026 <br />2.Include information about planned groundbreaking ceremonies, ribbon cuttings or other <br />public events for the site. <br />1 paragraph <br />A groundbreaking ceremony will take place at the beginning of construction once bidding and approval <br />have been completed. A ribbon cutting and opening celebration will take place once park is completed <br />and open for use. For each of these events we will invite community members and encourage all <br />affiliated parties and associations to be involved. <br />52
The URL can be used to link to this page
Your browser does not support the video tag.