Laserfiche WebLink
September 2, 1986 <br />Dear Crystal Bay Resident: <br />The sanitary sewer project in the Crystal Bay area was <br />completed, inspected and accepted on June 11, 1986. There are <br />some restoration items yet to be completed. <br />If you have not already done so, you can connnect your <br />residence or business to the sanitary sewer main line. <br />The deadline for connection to the sewer main line is 16 <br />months from June 11, 1986 or October 11, 1987. <br />A licensed contractor is required to make this type of <br />corinection in the City of Orono. <br />The contractor must obtain a permit from the City prior to <br />any work being done. <br />The permit fee is $30.50. A Service Availability Charge <br />(SAC) of $475.00 must be paid before or at the time the permit is <br />issued. Be advised that the City of Orono is only the collection <br />agency for the SAC fee. The Metropolitan Waste Control <br />Commission actually receives these monies. <br />Some of you may have already paid the SAC fee in advance. <br />For your information, your existing septic tank must be <br />pumped and filled with approved fill when connection to the sewer <br />main has been completed. <br />If you have any questions, please feel free to call me at <br />473-7359. <br />Sincerely, <br />John R. Gerhardson, <br />Public Works Coordinator <br />JRG/tln <br />