My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1983-07-29 Septic System Design Report
Orono
>
Property Files
>
Street Address
>
B
>
Brown Road South
>
350 Brown Road South - PID: 03-117-23-13-0001
>
Septic
>
1983-07-29 Septic System Design Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/18/2024 9:37:14 AM
Creation date
9/18/2024 9:33:10 AM
Metadata
Fields
Template:
x Address Old
House Number
350
Street Name
Brown
Street Type
Road
Street Direction
South
Address
350 Brown Road South
PIN
0311723130001
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
t T... <br />h <br />r-% <br />■ -n <br />%# • <br />iM'i. <br />'/i-' <br />..SITE EVALUATION REPORT <br />FOR DAVID RYERSE <br />350 S. BROWN ROAD <br />7-29-83 <br />On Jxoly 23-26, 1983 two percolation holes were tested and two aoil <br />borings were taken on the above property according to the provisions of <br />Individual Sewage Treatment Systems Standards ( WPC-40) in order to find <br />another area for a new drainfield. The area chosen was on a flat slope at <br />the base of a bank which is at least 75 feet back from the marsh and at <br />an elevation of about 4 feet above the swamp or marsh. <br />The soils were fairly sandy and had very good permeability which <br />■would require a shallow trench system because of the possibility of a • <br />high water table. However, in order to maintain at least 3 feet of i > . <br />separation between the bottom of the trench and the water table, some <br />•A., i <br />•* . * •. * -Vf* ^ <br />loanQT sand or sandy loan fill will be needed to be placed before <br />construction of the trenches. Also, grading should be done <br />in order to divert runoff water from entering the runoff <br />site. Sinc'e the water level in the borings is the same as <br />that of the marsh, an interceptor drain will not be necessary <br />with the systeri. <br />Additional system design ir.formation follows. If any <br />other infirroajion is needed, please contact me. <br />Sincerely, <br />FERCOR, INC. <br />/ <br />Mark S. Gronberg, P.E. <br /><1
The URL can be used to link to this page
Your browser does not support the video tag.