Laserfiche WebLink
O <br /> O O <br /> CITY of ORONO <br /> ti <br /> ti <br /> RESOLUTION OF THE CITY COUNCIL <br /> ��`9�ESFI�4�G NO. 4 6 1 9 <br /> 6) ' Road and parking lot construction plans, including confirmation <br /> that parking lots and roadways will be paved and provided with <br /> concrete curb and gutter, and that all driving lanes within parking <br /> lots shall have a 9-ton minimum pavement section. A geotechnical <br /> evaluation of the soil shall be done in conjunction with the <br /> pavement design and shall be submitted to the City Engineer for <br /> approval. Applicant shall provide detailed engineering evaluations <br /> and plans to indicate the stability of the parking areas located <br /> adjacent to the office building, including the retaining wall system <br /> adjacent to the property. <br /> 7). Detailed signage and lighting plans. <br /> 8) Any additional plans and specifications deemed necessary by the <br /> City as review progresses. <br /> B. Platting Process. Applicant shall complete all requirements for Final <br /> Plat Approval as outlined in a forthcoming Preliminary Plat Approval <br /> Resolution. <br /> C. General Conditions. <br /> 1) The sidewalk/trail connections shall be provided to the Brown <br /> Road trail along the east side of the property, from the property <br /> to the sidewalk along Highway 12, and between each of the <br /> proposed buildings. All trails shall be permanently owned and <br /> maintained by applicant/property owner to provide pedestrian <br /> access through the site. <br /> 2) Applicants' architect shall submit final development plans to the <br /> Metro Council Environmental Services to determine the exact <br /> number of SAC units to be charged at the time of the issuance of <br /> building permits. <br /> Page 8 of 13 <br />