My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1985-04-30 Soil Report
Orono
>
Property Files
>
Street Address
>
B
>
Bracketts Point Road
>
1280 Bracketts Point Road - PID: 11-117-23-32-0019
>
Land Use
>
1985-04-30 Soil Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/5/2024 3:06:42 PM
Creation date
9/5/2024 3:03:15 PM
Metadata
Fields
Template:
x Address Old
House Number
1280
Street Name
Bracketts Point
Street Type
Road
Address
1280 Bracketts Point Road
PIN
1111723320019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
< i <br />n <br />r <br />•f: <br />I <br />li <br />t; <br />1 <br />L <br />I. <br />1 <br />L <br />L <br />I <br />Page 8 - #120 86-74 <br />4S0 gallons, based on a three bedroom, Type I residence, the required total <br />treatment area Is about 570 square feet. <br />We suggest scarifying (tilling) the surface sod and then bringing in about 2’ <br />of sandy loam, loam or sand with about lOX fines. The fill material should <br />only rtfcelve light compaction, sufficient to achieve a density equivalent to <br />long-term settlement under its own weight. After the fill placement, trench#* <br />should be dug to a depth of about 2'-2J', and these should be about 3' In <br />width. About 9" of filter rock should be placed below the perforated lateral* <br />For 3' wide trenches, the total trench length should be about 190'. Four-4«' <br />long trenches spaced about 6* apart (7J‘ on center) would require filling in <br />area of about 70' x 50' for the primary system. About 26 cubic yards of <br />filter rock would be needed. Where any trench extends to within 8* of a tr#§ <br />or potentially large tree, additional filter rock should be placed. <br />Uf strongly discourage the use of a garbage disposal. Traffic of all types, <br />except for occasional mowing of the grass with light equipment, must be <br />restricted throughout tho year. The system should be monitored and the septic <br />lank should be pimiped, probably every two years or so, to promote longivity <br />of the soil treatment systai. The existing sprinkler system must be removed <br />from the new drainfield area. <br />FIELD EXPLORATIOW PROCEDURES <br />The borings were mad# on April 17, 1985. The borings were put down at the <br />locations suggested by you or discussed with you as shown on the attached <br />i
The URL can be used to link to this page
Your browser does not support the video tag.