My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1985-04-30 Soil Report
Orono
>
Property Files
>
Street Address
>
B
>
Bracketts Point Road
>
1280 Bracketts Point Road - PID: 11-117-23-32-0019
>
Land Use
>
1985-04-30 Soil Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/5/2024 3:06:42 PM
Creation date
9/5/2024 3:03:15 PM
Metadata
Fields
Template:
x Address Old
House Number
1280
Street Name
Bracketts Point
Street Type
Road
Address
1280 Bracketts Point Road
PIN
1111723320019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
View images
View plain text
mm. <br />B <br />a <br />n <br />I <br />I <br />3 <br />m <br />m <br />mt <br />m <br />2 <br />a <br />\1 <br />Pagt 6 • #120 86-74 <br />beyond the edges of the footings a dlstvcce equal to the depth of cowpacted <br />fin beneath the footings. This fill should be compacted to 95* of standard! <br />Proctor density. We recommend designing the foundations for a maximum <br />loading of 1500 psf (pounds per square foot). In our opinion, 1 sol If <br />win provide a factor of safety of at least three against a «ctua1 sheer <br />failure. We estimate total settlement will be up to 1” and differential <br />se*.‘.lifflent possibly up to 3/4'. Because the underlying natural soils are soat' <br />what erratic, we recommend providing a fairly rigid founjjatlon to Blnlinlie <br />the effects of differential settlement. <br />The present water level Is only about 4' below grade. In some areas, the <br />excavation will extend below the present water level. If at ill possible* <br />the excavation should be dewatered so that the soils can be observed prior <br />to placing the controlled fill. All fill placed below the present water <br />level should consift relatively clean sand with less than 10* passing! <br />a #200 sieve. <br />In the garige irea, the topsoil should be removed and replaced with controlled <br />compacted fill. 1^ recommend all fill placed in the garage area consist of <br />a ffratlvtly clean sand with less than 10* passing a #200 sieve. <br />SITC OSSCiVATIOll <br />lie rtcomtod that the excavation be observed by a soil engineer prior to the <br />placeKst of foimdattons or controlled fill. Ww also rccoBSttnd that deesltji
The URL can be used to link to this page
Your browser does not support the video tag.
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).