My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1986-08-11 Mechanical Specifications
Orono
>
Property Files
>
Street Address
>
B
>
Bohns Point Road
>
1535 Bohns Point Road - 08-117-23-44-0025
>
Permits/Inspections
>
1986-08-11 Mechanical Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/28/2024 2:02:05 PM
Creation date
8/28/2024 1:59:22 PM
Metadata
Fields
Template:
x Address Old
House Number
1535
Street Name
Bohns Point
Street Type
Road
Address
1535 Bohns Point Road
PIN
0811723440023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
85
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4 4 <br />-i <br />J <br />i <br />i- <br />■f^’s <br />SECTION 15350 <br />GAS PIPING SYSTEM <br />PART 1 - GENERAL <br />1.01 SCOPE <br />A. Provide a complete gas piping system. <br />B. The worK of this section includes, but is not limited to: <br />1. <br />2. <br />3. <br />Installation of firm natural gas service from gas meter <br />to in‘4*..^ual gas furances and equipment. <br />This Contractor shall be responsible for obtaining the <br />gas services from the utility company and shall pay all <br />fscr, connection charges and/or deposits as required. <br />Furnish and install steel sleeves for installation of <br />gas service line wherever necessary. <br />PART 2 - PR^ nUCTS AND EX: -UTION <br />2.01 GENERAL <br />A. Gas Piping <br />1. <br />2. <br />3. <br />4. <br />5. <br />6. <br />7. <br />Refer to Section 15060 and 15100 for material. <br />Furnish ana install lever handles brass gas service cocks, <br />appliance and lubricated plug valves on the mains and <br />wherever else indicated. <br />Test: Refer to Section 15020. <br />Gas service by the gas company to inlet side of gas meter <br />including primary regulator and meter will be installed <br />by the Gas Utility Company as a part of the work of this <br />section. <br />Gas meters including primary regulating valves will be <br />furnished and installed by the Utility Company. This <br />Contractor shall pay for all costs not borne by the <br />Utility Company as part of the work of this installation. <br />This Contractor shall make all necessary arrangements <br />with the Gas Utility Company for the completion of this <br />service. <br />This Contractor shall extend gas piping from leaving <br />side of meters at 2 lb. w.c. pressure to all gas equip <br />ment in the building. The gas service from meter into <br />bhilding shall be extended above the ground with dielectric <br />union before entering the building and shall be provided <br />with a shut-off valve outside of the building. Provide <br />2# - 7" Maxitrol regulators on all equipment. <br />Gas piping shall be installed with plugged drip pockets <br />at low points. Valves or cocks and unions shall be <br />installed on inlet piping to all equipment. This Con <br />tractor at all gas appliances shall provide an approved <br />regulator to reduce the presure from nominal 6" w.c. <br />to that required by the appliance. <br />15350-1
The URL can be used to link to this page
Your browser does not support the video tag.