My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-12-1990 Council Packet
Orono
>
City Council
>
1990
>
02-12-1990 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/23/2024 1:31:11 PM
Creation date
8/23/2024 1:21:01 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
422
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
•WI STD *8t SID *89 STD •90 STD 1987 Stert Ttrm QDjective1988 Short Hm Otij&cti^1989 Short Tkm Gbjactivo1990 Shore Term Gl^^ctive GCAL SBrmC cm OF CBOHOB. BBUBMPSOH cm AEMDilSnATDR 1 mr 1989 - 30 APRIL 1990 Draft 5/19/89 RBvioed 6/30/89 7/31/89 9/05/89 9/29/89 10/31/89 12/04/89 12/27/89 1/31/90AREAGOAL AREA CBJBCn\'E DATES STATOS1. OCM40NITT DEVELOPMENTA. Highway 12 1. Utilities Sewer - Part I Install 09/01/8** <br />Sewer - Part II <br />Water System <br />Install <br />Install <br />Main <br />Well (6 rvnnths) <br />07/01/90 <br />09/01/89 <br />04/01/90 <br />Bids Close 6/30/89 <br />Project Ordered 7/24/89 <br />Negotiating Aannt Terms/Oevelop Agmnt <br />Commenced Construction 10/27/89 6 11/13/89 <br />Oonpleted 1/30/90 except for testing <br />1/22/90 Feasibility Study to Orooo Plant <br />Ordered <br />Project Ordered 7/24/89 <br />Ooramenced Construction 10/27/89 & 11/13/89 <br />Conpleted 12/15/89 <br />2/1/90 Need available water <br />9/U/89 Table Teat Well to 9/25/89 <br />9/25/89 Awarded Test Wells <br />11/1/89 Oannenoe Test Drillings <br />11/6/89 Test drilling found adequate aquifer <br />11/13/89 Interim production well drilled <br />1/15/90 Teat Results CK <br />Mail Vtell Bids Close 2/2 <br />Tower (9-12 months) <br />Plans Specs - order <br />Award <br />07/01/90 <br />09/89 <br />11/89 <br />Financing <br />Negotiation on Utilities <br />(Long Lake - Medina) <br />09/U/89 <br />10/04/89 <br />8/14/89 Bond Resolution adopted <br />Requested to negotiate with ^Sedina 10/23/89 <br />Bond Sale Awarded/AAl Rating/6.57% <br />Bond Closing <br />Conmonced water discussion 10/25/89 <br />with Medina - Jtedina to meet with affected <br />real ts 1/90 to discuss
The URL can be used to link to this page
Your browser does not support the video tag.