My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-12-1990 Council Packet
Orono
>
City Council
>
1990
>
02-12-1990 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/23/2024 1:31:11 PM
Creation date
8/23/2024 1:21:01 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
422
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
i^AVAKKE___STUDYPREUMINARV l^iND USE ALTERNATIVE CHintTRofld 19 Arfgpand and concentrate commercial at Co. Rd. 19■«" the «r«. v««n ,o co=ml «x«. and land conflictlop moI,4,te r«id«.dal «d office .0 supper, conunerdu] uses i qoulrV muldple residendal .0 cupnrre luk./ope. spec viesleim stnci developmenl staudards to reduc visuai and operadonajJopment should enhance the areas imagerve .oodland and wedand buffers, develop open spac systenss LPoint <br />id and concentrate office at Casco Point Road <br />. »0« sysren. .0 enlarge offic area and reduc access and land use cnffics <br />unplenren, srric developuren. sdndards .0 reduc visual and operational <br />ad? Avenii^ <br />e county and city maintenance facilities <br />■ ntuldple residential adiacen. .0 Cdunty Road in and around dte wedand <br />wetland and incoiporate it into the open space ^tem <br />* gl family on county proper^ abutting adsting single family <br />concentrate access at Dunwootfy and control land <br />Jie Dunwootfy intersection <br />impl^aen. scric. developncc s»ndards .0 reduc visual and operadcal <br />101889.5DATE:Mayor and City CouncilMark E. Bernhardson, City Administrato October 18, 1989SUBJECT: Navarre Redevelopment - Stage II ContractAttachment: A. Navarre Redevelopraent/Consultant AgreementDated 6/12/88B. Proposed Addendum Stage IIISSUE - Authorization to adopt the addendum as part of the contr ac*"V • <br />INTRODUCTION - The initial estimate for the work for Stage I was <br />approximately $15,000. Because of the protracted nature of the <br />proceedings on the matter together with the request for <br />development of options to help illustrate parts of Stage I, the <br />work done by the consultant has begun to actually lapse into Part <br />1 S tag e 11. <br />DISCUSSION - It is requested that the Council authorizean <br />addendum for Stage II up to an amount not to exceed $5,000. This <br />would bring the total authorized to date up to $20,000. A total <br />of $30,000 has been budgeted between 1988 and 1989. After the <br />meeting on November 18th an estimate for the balance will be <br />prepared depending on the scope of work decided upon at or <br />following that meeting. <br />ALTERNATIVES <br />1. Adopt the addendum. <br />2. Stop the contract at the proposal. <br />3. Table for further discussion. <br />RECOMMENDATION - It is recommended that the addendum be adopted <br />a"s pr es ented. This authorization is up to $5,000 for Stage 11 <br />Phase 1 Step 1. <br />PROPOSED MOTION - Moved by _, seconded by _, Orono City Council <br />authorizes amending the agreement with Dahlgren, Shardlow and <br />Uban regarding Navarre Redevelopment to include an additional <br />$5,000 for beginning Stage II work. Ayes _, Nays _. <br />cc: John Shardlow <br />Ed Hasik <br />Jeanne A. Mabusth, Building & Zoning Administrator
The URL can be used to link to this page
Your browser does not support the video tag.