Laserfiche WebLink
I Zoning Pile #1428 <br />February 1, 1990 <br />Page 2 of 2 <br />Section 10.61, <br />setback. <br />Subdivision 3 (D) - Allowed height and <br />A) The building is proposed at 30'+ in height. Plyon <br />sign A proposed at 21' and pylon B sign proposed at <br />B) Required setback = 10' <br />Proposed at Willow Dr/Highway 12 <br />Per directives to applicant at the time of conceptual <br />approval of the general concept stage of the PUD, Mr. Otten has <br />submitted a total signage plan for the garden ce''’er project. <br />Based on the factual findings noted above, it would appear <br />that applicant seeks approval for 2 pylon signs that would exceed <br />the allowed 50 s.f. in area under the B-l/B-6 standards for <br />signage. This approval is sought under the PUD application and <br />Council's authority to deal with variations from the recommended <br />standards. This special approval will be set forth in the final <br />resolution approving the PUD and final subdivision.