My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01-22-1990 Council Packet
Orono
>
City Council
>
1990
>
01-22-1990 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/10/2024 2:16:42 PM
Creation date
8/16/2024 10:59:50 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
716
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MINUTES OP OROWi COUNCIL MEETING OP JANUARY 8, 1990ZONING PILE #1468-PILLSBURT CONTINUEDNettles, to approve the hardcover, setback, and average lakeshore setback variances and the conditional use permit for the 1 Isburys. CounciImember Goetten indicated that she would support the conditional use portion of this application. Goetten said that she had to be cons: stent, howevct, and has never approved any new hardcover within the 0-7*5' setback rone. Goetten said that she could see no real hardship for the greenhouse and questioned if it could be located elsewhere. Goetten said that she tries to be fair, but feel^ this would be precedent setting if approved. CounciImember Callahan said that the characteristics of the lot a^'e such that a hardship is not difficult to find. Callahan said that he too, however, must be consistent and could nr»? vote favorably for new structure within 0-75' of the lake. Motion, Ayes-2, Goetten, Peterson, Callahan, Nay, Motion failed.Mr. Mitchell said that there is no other location for the greenhouse that would remove it entirely from the 0-75' zone <br />because of the location of the house. <br />Mayor Grabek sa’i* that thi Council cannot tell the <br />Pillsburys where to locate the greei.."cmsc other than a location <br />out of the 0-75' setback area. <br />Mr. Baldwin said that one of the problems with locating the <br />greenhouse elsewhere is that the plant material the Pillsburys <br />wish to culture requires exposure provided in the location <br />proposed. Mr. Baldwin said that the best exposure would occur if <br />the greenhouse were located more to the east. However, in that <br />location, there would be further encroachment into the 0-75' <br />setback zone. <br />It was m^ved by Counci lme»’ <br />CounciImembe:' vjoetten, to direct <br />of denial of the structure additi« <br />of the retaining wall work. Mot. <br />Nay, Motion passed. <br />Ca ’ han, seconded by <br />to ^lepare a resolution <br />e incorporating approval <br />rtyes-3, Grabek, Nettles, <br />#1480 ED TOTH <br />725 OLD CRYSTAL BAT ROAD SOOTH <br />VACATION/VARIANCBS <br />RESOLUTION OF DENIAL *2744* <br />It was moved by CounciImember Nettles, seconded by <br />CounciImember Peterson, to adopt Resolution #2744, denying a 0.9' <br />side setback variance for a proposed deck addition at 2811 <br />Farview Lane. Motion, Ayes-5, Nays-0, Motion passed. <br />ENGINEER'S STSFORT: <br />HIGHWAY 12 SEWER AND WATER PAYMENT* <br />It was moved by CounciImember Nettles, seconded by <br />Council.nember Peterson, to approve payment request #2 for <br />Albrecht Excavating, Inc., in the amount of $59,418.59. Motion, <br />Ayes-5, Nays-0, Motion passed.
The URL can be used to link to this page
Your browser does not support the video tag.