Laserfiche WebLink
p.„ B, north Frontage 8o.d £ro» Orooo Road »o. 87 to Brinhall Avanua Ext. <br />Estimate II - City of Orono <br />Item <br />Common Excavation <br />Class 3 Aggregate base <br />Claes 5 Aggregate base <br />2331 Bituminous base course <br />2341 Bituminous wear course <br />AC-1 Bituminous material for <br />mixture <br />Bituminous material for tack <br />coat <br />B618 Concrete curb & gutter <br />15' RCP culvert <br />18" RCP culvert <br />24* RCP culvert <br />18" RCP apron w/trash guard <br />24* RCP apron w/trash guard <br />Standard catch basin <br />Standard catch basin manhole <br />Rip rap w/geotextile fabric <br />Mechanical trench compaction <br />Restoration <br />Unit <br />C.Y. <br />Unit Price Est. Quant.Eat. Coat <br />$ 3.00 2,000 $ 6.000.00 <br />C.Y.6.00 400 2.400.00 <br />Ton 6.00 550 3,300.00 <br />Ton 14.00 40 560.00 <br />Ton 16.00 20 320.00 <br />Ton 150.00 4 600.00 <br />Gals.2.00 100 200.00 <br />L.F.6.00 3.700 22,200.00 <br />L.F.22.00 200 4,400.00 <br />L.F.24.00 450 10,800.00 <br />L.F.30.00 300 9,000.00 <br />Each 600.00 2 1,200.00 <br />Each 800.00 1 800.00 <br />Each 700.00 4 2,800.00 <br />Each 1.000.00 5 5,000.00 <br />C.Y.100.00 14 1,400.00 <br />L.F.1.00 1.000 1,000.00 <br />Acre 6,000.00 1.2 4.800.00 <br />Estimated Construction Costs $ 76,780.00 <br />102 Contingency <br />Total Estimated Construction <br />182 Legal, Engr., Admin. <br />Total <br />52 Bonding & Capitalized Interest <br />TOTAL PROJECT COST . . . . . . . . <br />7.680.00 <br />$ 84,460.00 <br />15.200.00 <br />$ 99.660.00 <br />4.940.00 <br />$104,600.00 <br />- 5 - <br />i i{ <br />♦ t <br />1 <br />!? <br />■ <br />M <br />APP13951