My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01-22-1990 Council Packet
Orono
>
City Council
>
1990
>
01-22-1990 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/10/2024 2:16:42 PM
Creation date
8/16/2024 10:59:50 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
716
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Item Unit Unit Price Est. Quant.Est. CostCommon excavation C.Y.$ 3.00 3,000 $ 9,000.00Class 3 Aggregate base C Y.6.00 600 3,600.00Class 5 Aggregate base Ton 6.00 800 4,800.002331 Bituminous base course Ton 14.00 56 784.002341 Bituminous wear course Ton 16.00 28 448.00AC-1 Bituminous material for mixture Ton 150.00 5 750.00Bituminous material for tack coat Gals.2.00 100 200.00 <br />B618 Concrete curb k gutter L.F.6.00 5,450 32,700.00 <br />15■ RCP culvert L.F.22.00 850 18,700.00 <br />18" RCP culvert L.F.24.00 750 18,000.00 <br />36" RCP culvert L.F.45.00 400 18,000.00 <br />36" RCP apron w/trash guard Each 1,500.00 2 3,000.00 <br />Standard catch basin Each 700.00 5 3,500.00 <br />Standard catch basin manhole Each 1,000.00 4 4,000.00 <br />5* dia. catch basin manhole Each 1,500.00 2 3,000.00 <br />Rip rap w/geotextile fabric C.Y.100.00 20 2,000.00 <br />Mechanical trench compaction L.F.1.00 2,000 2,000.00 <br />Restoration Ac.4,000.00 2.0 8.000.00 <br />Estimated Construction Costs $132,482.00
The URL can be used to link to this page
Your browser does not support the video tag.