Laserfiche WebLink
Item Unit Unit Price Est. Quant.Est. CostCommon excavation C.Y.$ 3.00 3,000 $ 9,000.00Class 3 Aggregate base C Y.6.00 600 3,600.00Class 5 Aggregate base Ton 6.00 800 4,800.002331 Bituminous base course Ton 14.00 56 784.002341 Bituminous wear course Ton 16.00 28 448.00AC-1 Bituminous material for mixture Ton 150.00 5 750.00Bituminous material for tack coat Gals.2.00 100 200.00 <br />B618 Concrete curb k gutter L.F.6.00 5,450 32,700.00 <br />15■ RCP culvert L.F.22.00 850 18,700.00 <br />18" RCP culvert L.F.24.00 750 18,000.00 <br />36" RCP culvert L.F.45.00 400 18,000.00 <br />36" RCP apron w/trash guard Each 1,500.00 2 3,000.00 <br />Standard catch basin Each 700.00 5 3,500.00 <br />Standard catch basin manhole Each 1,000.00 4 4,000.00 <br />5* dia. catch basin manhole Each 1,500.00 2 3,000.00 <br />Rip rap w/geotextile fabric C.Y.100.00 20 2,000.00 <br />Mechanical trench compaction L.F.1.00 2,000 2,000.00 <br />Restoration Ac.4,000.00 2.0 8.000.00 <br />Estimated Construction Costs $132,482.00