My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01-22-1990 Council Packet
Orono
>
City Council
>
1990
>
01-22-1990 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/10/2024 2:16:42 PM
Creation date
8/16/2024 10:59:50 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
716
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
C) Groundwater Thertnal Exchange Devices and Vertical Heat Exchangers <br />Require a $50 permit fee. <br />0) After July 1, 1990, A $50 permit fee is required for an excavation <br />for an elevator shaft.. <br />u <br />7. Maintenance Permits <br />Annual maintenance permits are required for all inoperable wells that are <br />not sealed. A $50 annual fee is required. <br />Annual maintenance permits are required for monitoring wells constructed <br />after January 1, 1990. If a monitoring well is not sealed within <br />fourteen months after construction, a maintenance permit is required and <br />a $50 fee must be paid. For monitoring wells at motor fuel retail <br />outlets and petroleum oulk storage sites, the permit fee is $50 per site. <br />Annual maintenance per its are required for dewatering wells constructed <br />after January 1, 1990. If a dewatering well is not sealed within <br />14 months after construction, a maintenance permit is required and a <br />$25 fee must be paid. For dewatering well projects of more than <br />10 wells, the permit fee is $250 per site. <br />LOCAL GOVERNMENT IS EXEMPT FROM ALL PERMIT, NOTIFICATION, AND VARIANCE <br />FEES BUT MUST COMPLY WITH THE PERMIT AND NOTIFICATION REQUIREMENTS. <br />8. Well Sealing <br />A well owner is responsible for having an unused well sealed by a <br />licensed contractor. <br />If a well poses a public health hazard, the Commissioner may order the <br />well to be sealed. Failure of an owner to seal a well may result in the <br />Commissioner having the well sealed and assessing the cost to the <br />property owner. <br />Counties may declare a well a public health nuisance and have it sealed <br />and assess the cost to the property owner. <br />A cost-share program with limited funds, administered by the Board of <br />Water and Soil Resources, provides funds for selected counties to pay up <br />to 75% of the cost of sealing a well not to exceed $2,000. <br />9. County Well Certificate <br />Counties must issue sealed well certificates prescribed by the <br />Commissioner of Health for all wells that are sealed.
The URL can be used to link to this page
Your browser does not support the video tag.