My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01-22-1990 Council Packet
Orono
>
City Council
>
1990
>
01-22-1990 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/10/2024 2:16:42 PM
Creation date
8/16/2024 10:59:50 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
716
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
EFFECT «r adttpi p 3 of the groundwater PROTECTION ACT ON LOCAL GOVERNMENTHELLS AND BORINGSOF WELLS AND BORINGS ..^11 .'-nnrams remeiUl, and irri,.tioA «lls. <br />cards of Hoaltl. m '"'"’"J? ?l!c‘^t^"t'or,‘^55r4n” Jj""''' <br />rt°dSt^« conJtrodtiod, r.p..r, and <br />I of wells, <br />rnwntal BoT’e Holes. <br />. hole or excavation in the 9^°“"^.^!l*!r*TOl£urrph?Iical7*'^^ <br />Waterbearing Jay«^ f‘^oJ%“oiJgi?aT ’paraineters <br />Sj^'^^AnlSlirSSwnial bore ^ole eivironment <br />^ftWucfed for vapory exploratory,re holedoes not inckdeawen. <br />>ring, or monitoring wen. <br />4. Variance FeesA $150 fee is required for a variance request not related to construction of a »»en or boring. Variances from minirauro isolation distances between wells and contamination sources, hazards, surface water and property lines are •'eluded in this category. Construction-related variances require a >j0 fee for:A) Wells with a pump capacity less than 50 gallons per minute.B) Monitoring wells.C) Dewatering wells.Construction-related variances require a $100 fee for wells with a pump capacity of 50 gallons per minute or more. All variance fees are nonrefundable.5. Isolation DistancesActual or potential sources of contamination may not be placed any closer to a well than the isolation distances prescribed by the Commissioner in <br />rule unless a variance has been requested and approved. <br />6. Construction Permits and Notifications <br />Fffegtive January 1- IQ90- the State will require permits or <br />notifications for all well construction. Unless a local Health Board has <br />a delegation agreement with the Commissioner of Health, the State permit <br />and notification preempt any local permit or notification (Minnesota <br />Statutes, Section 1031.205, Subdivision 1(c). <br />A) Water Wells <br />Prior to construction of a water well, the property owner must notify <br />the Minnesota Department of Health in writing and pay a $50 fee for <br />wells with a pump capacity of less than 50 gallons per minute, or a <br />$100 fee for wells with a pump capacity of greater than or equal to <br />50 gallons per minute. <br />B) Monitorino Wells and Dewatering Wells <br />Monitoring Well-A $50 fee must be paid for each monitoring well <br />constructed except for monitoring wells at motor fuel outlets or bulk <br />storage site, where the fee is $50 per site. <br />Dewatering Hell—A $50 fee must be paid for each dewatering well <br />except that dewatering projects with more than 10 wells require a <br />$500 permit fee. <br />4
The URL can be used to link to this page
Your browser does not support the video tag.