My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1982-02-04 Letter, Sewer Installation Cost
Orono
>
Property Files
>
Street Address
>
B
>
Baldur Park Road
>
1340 Baldur Park Road - 08-117-23-31-0015
>
Correspondence
>
1982-02-04 Letter, Sewer Installation Cost
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/8/2024 3:40:52 PM
Creation date
8/8/2024 3:39:16 PM
Metadata
Fields
Template:
x Address Old
House Number
1340
Street Name
Baldur Park
Street Type
Road
Address
1340 Baldur Park Road
PIN
0811723310015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4adoo" 6 <br />is" RY. 9J Af•+r M <br />Z X.l R►. - eern <br />PA.. 412."d a600 <br />EXHIBIT <br />5no. <br />4( 1956 - 5th - 1981 ' <br />=a1 nnivcrsary <br />r i <br />February 4, 1982 <br />City of Orono <br />BOR 66 <br />Crysta_ Day, MN 557'7 <br />Attn: Jeanne Maybusth <br />Re: Tonke Lake Property <br />1340 Bolden Park Raod <br />Our File 139-669 <br />Dear Jeanne: <br />This letter provides an estimate of the cost of constructing a sever line to <br />serve the Gladys Olson home. <br />450 <br />m... C/ <br />8" DIP Sanitary Sever @ 516.00/lin.ft. <br />r.vn Or M.v.• RI <br />105 <br />/.rrL r J.4rld I I <br />A" PVC Sanitary Sever 8 514.00/lin.ft. <br />1,470.00 <br />450 <br />•4Ir4 I I..v.. II <br />Insulation 4'wide P 58.00/lin.ft. <br />1..... I Olr r 1 <br />4( 1956 - 5th - 1981 ' <br />=a1 nnivcrsary <br />r i <br />February 4, 1982 <br />City of Orono <br />BOR 66 <br />Crysta_ Day, MN 557'7 <br />Attn: Jeanne Maybusth <br />Re: Tonke Lake Property <br />1340 Bolden Park Raod <br />Our File 139-669 <br />Dear Jeanne: <br />This letter provides an estimate of the cost of constructing a sever line to <br />serve the Gladys Olson home. <br />450 <br />Lin.ft. <br />8" DIP Sanitary Sever @ 516.00/lin.ft. <br />S 7,200.00 <br />105 <br />Lin.ft. <br />A" PVC Sanitary Sever 8 514.00/lin.ft. <br />1,470.00 <br />450 <br />Lin.ft. <br />Insulation 4'wide P 58.00/lin.ft. <br />3,600.00 <br />1 <br />Each <br />8" Wye Branch A SSO.00/ea. <br />50.00 <br />?0 <br />Lin. ft. <br />6" CISP Is 510.00/lin.ft. <br />200.00 <br />100 <br />Ton <br />Class S eXtrepate base (1001 crushed) <br />e 58.00/tin <br />800.00 <br />0.1 <br />Acres <br />Seeding @ 07,000/ac. <br />1,500.00 <br />TOTAL CONSTRUCTION ........................ <br />$14,820.00 <br />The sewer line will have lore than three feet of cover in some cases and <br />insulation of the main will be required. If you have any questions, please <br />contact this office. <br />Tours very truly, <br />BORESTROO, ROSEME, ARDERLIR 4 ASSOCIATES, INC. <br />Clenn R. Cook <br />r)RCI jo <br />R7n9e <br />
The URL can be used to link to this page
Your browser does not support the video tag.