My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11-08-1989 Special Council Planning Commisioin Facilities Packet
Orono
>
City Council
>
1950-2024
>
1980-1989 Microfilm
>
1989
>
11-08-1989 Special Council Planning Commisioin Facilities Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/2/2024 9:39:18 AM
Creation date
8/2/2024 9:37:56 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
~ > -ji'WAy?.': I-'<' - ^v-m'INQ LEVELS OF QUALITYlOR • 80. lAKE MINNETONKA PUBUC SAFETY BLDQ.S W WUNQ. CHW OF PUBUC SAFETY: 474-3261SAFETY BUILDING (NEW FAGUTY) $86.00 8.F.Exterior Wan Mitertato • Brick and ConorMa Block Roof-AaphaltShlnG^oa <br />Interior FlnlfhM <br />Floor- <br />Wall•• <br />Celllno- <br />Millwork< <br />Medium grade carpet <br />Vinyl compoiltlontlle <br />Qyi^m board, painted <br />2X4 Aoouitle tOa <br />Plaitic laminate (minimum quantity) <br />MKhanical Syitamt <br />HVAC- <br />SprinWer Syatame* None <br />Bectrioal Sytieme <br />Forced air. cefllng dWfusera. rwldentlal furnace units <br />housed In basement mechanloel room. <br />Lighting- <br />PONW- <br />Acrylio lens fluorescent <br />Basic code required. <br />eBAUNOTHs: <br />K|liag: <br />mi <br />mM <br />! 1^.*' <br />mm <br />mm:v--. ;., ■■■ -••• • <br />mi <br />itsm-mm <br />mmmrnm <br />ia**s?.|iii <br />,,3 <br />>y-. ;■■ >v- <br />mm <br />ifiwi <br />mm <br />mm&m <br />-ym <br />w#®«iPi Riin <br />iiii <br />c <br />piPI;'fMfc^:::43¥.£ilL-'^ mmm‘V'’_ ■•.mm*V V Vv -< «V ,"■•- "■* <br />mm-rn <br />mmm <br />I <br />£• .-'.rnmm} m-' <br />m ■ ■: m' _< \ 'mm^mm <br />®vSiii••■;V./Vv:;\®l <br />i -•:■!'■. y mm-U <br />l;v.;-'-'-.v'. ■• ■ ' <br />mm „iv. I .i?hi=^- riv...- •':SUMMARY OF COMMENTS/CITY HALL TOURII. Champlin - City Hall/Police renodeling/newPublic Works new facilityThe City Hall/Police remodeling and new construction was very well done. Entry way was an excellent design as was the Council Chambers. The use of room dividers was nicely done. I am aware of heating problems in the new addition. This may be the result of change orders made during construction.The Police department seemed tc be well laid out and convenient for employees and the public.The new Public Works building was very nice and bad a large community room. The garage and shop area was large/ clean and <br />well lit. <br />The landscaping for the site was very well done. <br />"Retro Fitting" City Hall - Limited design. Nice drive-up <br />appearance. <br />Public Works wr ■> 1 hidden - use of vines to cover wall good. <br />Maintenance area separated from vehicle area (seemingly unused.) <br />North facing exit door. <br />Temporary storage buildings/outside storage could be improved. <br />City Hall - Front desk - open service appearnace - able to secure <br />equipment from public at closing. Central core upstairs for <br />common use areas. <br />Council Room - heavy wood made it seem somewhat small. <br />Police - Combined squad room/training room. Quiet room/soft <br />interview room good idea. Explore need for type of holding <br />facility. Good evidence custody setup. <br />Cramped space for Police personnel. Inadequate storage room <br />Nice layout of squad room and lock-up. <br />•71"mMm <br />' ••’’V
The URL can be used to link to this page
Your browser does not support the video tag.