Laserfiche WebLink
ON SEWAGE TREAIMENT <br />INSPECTION REPORT <br />On for Nrirtli Sherr of <br />Lake Allinnetoukill <br />POST OFFICE BOX 66 <br />1335 S. Brown Rd. <br />Crystal Bay, MN 55323 <br />473-7357 <br />OWNER M I h� h1 S -- ADDRESS 2-5 illi " /6 0 "S. <br />PERMIT NO.'S. <br />DATES <br />CONTRACTORS <br />City Ordinance No. 210 requires that each omslte sewage treatment system in Orono be inspected on a regular burs. The on-site tiewaya <br />treatment sysa•m at the above <br />,oiddress has Ix -en inspected and appears to fall into the category checked below <br />IThisis QTanexistrngsystem ❑ new construction) <br />1 Meets or exceeds current City standards in all respects relating to design, construction, and location. Appears 10 be OpWiMng <br />propertV. <br />2 Does not meet all current City standards for r.ew construction 11978 Codel but in most respects appears to be designed. <br />located, and constructed generally in accordance with previous codes. System appears to be functioning properly; no major <br />upgrading of the system is required at this time. <br />❑ 3 Does not meet current City standards in many respects relating to design, construction, or location. Appears to be operating <br />adequately at this time, but has a relatively high potential for future problems. No major upgrading of system is required at <br />this time. <br />O4 System may or may not meet current City standards lo, design, construction or location, but is failing to properly [teat and <br />dispose of the current input• and is endangering a water supply• or is a source of pollution to surface or groundwaters, or is <br />creating a safety hesard• at is otherwise creating a public nuisance. Please contact the City Inspector to discuss sWt"r—oiaa/ <br />,solacement procedures. It dramlield replacement is necessary, soil testing will usually be required, and a design and site plan <br />must be submitted for review. your contractor must obtain a permit before work is started. <br />SYSTEM CONDITION 1 60 Checked items may require your action) <br />Tank inspection indicates. <br />i a Purnpout not needed at this time. <br />❑ Solids accumulation in tanks indicates they should be pump• <br />ed out this year to help prevent future problems. <br />❑ Solids accumulation in tanks is at a critical level. Tanks <br />should be pumped out as soon as possible. <br />❑ System is discharging to surface. Tanks must be pumped <br />within 48 hours to eliminate surface discharge. <br />❑ Inspection users missing—tanks could not be inspected. <br />Inspection risers 14" dia. pipe) must be installed in each tank <br />at next pumpout. If tanks have not been pumped out within <br />the last three years. they should be pumped out now. <br />SITE CHARACTERISTICS <br />Limiting Site Factors <br />❑ <br />Slope <br />❑ <br />Soil <br />❑ <br />High water table <br />Cl <br />Lot sire <br />C <br />Lake• wetland, or stream <br />❑ <br />Drainage <br />COMMENTS <br />❑ Inspection pipe is located directly over tank baffle. (Does not <br />give accurate measurement of solids accumulation.) If tanks <br />have not been pumped out within the last three years, they <br />should be pumped out now. <br />Dramfield inspection indicates <br />❑ Drainfield is dry, no surfacing evident. <br />❑ Some evidence of surfacing, not critical yet. <br />❑ Dramfield is saturated and visibly discharging untreated <br />effluent to the surface. This condition may require replace. <br />ment or additions to dramfield. Contact the City Inspector <br />immediately. Repairs must be completed within 90 days. <br />❑ Drainlield extent and condition unknown. <br />Potential for System Failure <br />Idepends on soil types. water <br />table• and system rendition) <br />C Low <br />- _0 Medium <br />0 High <br />❑ System ,s causing visible <br />surface discharge. <br />Site Capabrbttes for <br />Future Expansion <br />❑ Adequate <br />{] Fair <br />C Poor <br />n Inadequate <br />-3r/ / �S�/c' <br />Date of Inspection p6ptic System Inspector <br />Note. In the event that this inspection report is used to satisfy the ,equirements for a mortgage or other transfer of property, be advised trial <br />this report hoes not guarantee or civility that an existing system will continue to function properly, but is merely an opinion of the adequacy <br />Of the system under current conditions based r9 the available information. <br />This report must be kept on the premises with system location and pumpmq records. <br />WHITE COPY I Inspecto. rile GOLD COPY I Homeowner <br />