Laserfiche WebLink
MINUTES OF THE ORONO PLANNING COMMISSION MEETING OF NOVEMBER 18» 1991 <br />ROLL <br />The Orono Planning Commission meet on the above date with the <br />following members present: Planning Commission Chair Charlie <br />Kelley and Planning Commission Members Maureen Bellows, Candace <br />Rowlette. Charles Schroeder and Jeff Johnson. Ed Cohen and Sara <br />Moos were absent. The following represented the City Staff: <br />Building and Zoning Administrator Jeanne Mabusth, Septic Manager <br />Stephen Weckman, and City Recorder Teri Naab. The following <br />Council Members were present: Council Members Jabbour. Goetten <br />and Callahan. Chair Kelley called the meeting to o.'der at 7:00 <br />p. m <br />(#1) #1691 & #1702 CITY OF LONG LAKE, <br />130 ORONC ORCHARD ROAD NORTH <br />A) AMENDMENT OF COMMUNITY MANAGEMENT PLAN/PRELIMINARY <br />B) COHDITIONAL USE PERMIT FOR PLANNED RESIDENTIAL DEVELOPMENT <br />?j:rA£?f5aJirir and certificate of Mailing was <br />noted. <br />David Squire of McCombs Frank Roos was present to represent the <br />^i^roa^ iulnifnras r^Ne*c!trCon ‘??!^ S: ^^a ed^nt <br />was there to request Planning Commission action on this matter. <br />Mabusth noted that this property was excluded from the <br />subdivision moratorium. She noted the applicant are proposes a <br />13 lot PRD development based on existing standards ot the Z acre <br />zoning. The property cons* ><-s of 24.5 acres and 26 acres are <br />needed to satisfy the PRD r, rements. Applicants are seeking a <br />lot area variance of 1.5 acr^ Each pad meets approximately a I <br />acre density. She stated t..at Lot 1. Block 1 wo oot have <br />interior access to the plat road. Mabusth pointed cut the road <br />outlot at the north end would be designated as a separate out lot <br />for possible future expansion to the north. The floocplain has <br />been designed at 947.3' and therefore the lagoon cannoi be used <br />for drainage from the development as it is below elevation. <br />She noted that a retention pond may be needed in the southern <br />portion of the property that may be needed to handle runoff from <br />Lots 3, 4» 5 and 6. A retention pond is shown within Lots 11 and <br />12. for the northern portion also. Mabusth stated that the <br />applicants propose special setbacks for several of the lots. Lot <br />i; Block 1 would have a 25* setback from the roadway. Lots along <br />Orono Oaks plat would have a 50* rear setback. All lots will <br />meet a 35’ street setback and a 10' side setback. She noted that <br />building pads have been proposed on either side of the forcemain <br />within Lot 1, Block 2, which may be an issue to consider. <br />is considering directing runoff through his property. He noted <br />that he was not prepared to address the issue.