My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11-25-1991 Council Packet
Orono
>
City Council
>
1991
>
11-25-1991 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/26/2024 12:40:35 PM
Creation date
7/26/2024 12:38:13 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
256
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
?.■« <br />DI8CRIPTI0N <br />1991 <br />FEE <br />1992 <br />FEE <br />C0II8TR0CTI0N PERMITS AND IWSPECTIOM FEES <br />MUNICIPAL CONNECTION PERMIT (together with ai.ea connection charges) <br />Hater <br />5/0" meter including sales tax <br />3/4" meter including sales tax <br />1" meter including sales tax <br />$125.00 <br />$163.00 <br />$218.00 <br />$133.00 <br />$181.00 <br />$235.00 <br />ALL COmiBCTION CHARGES (IF NOT PREVIOUSLY ASSESSED) <br />BT DISTRICT - PROiE^T <br />ALL SANITARY SEWER CONNECTION CHARGES <br />ALL MUNICIPAL WATER CONNECTION CHARGES <br />ON-SITE SYSTEMS <br />Residential System Permit: <br />Repair/Replace existing system <br />Replace drainfield & repair 1/more tanic <br />New Residential System <br />Replace Drainfield & Replace 1/ more <br />tank <br />Annual Service Charge <br />GRADING, EXCAVATING, FILLING <br />• 1-100 cubic yards (max. 10 loads) <br />’.T.--: r <br />Various Various reflecting <br />cost of investment <br />Various Various reflecting <br />cost of investment <br />$ 30.00 <br />$ 50.00 <br />$ 75.00 <br />$ 50.00 <br />Delete <br />$100.00 $20.00 <br />per each inspection <br />over 3 <br />(Includes outhouse <br />on Big Island) <br />$ 50.00 Delete <br />$ 25.00/system $ 50.00/system/year <br />year plus an plus an additional <br />additional full $10.00 fee for <br />fee for late late penalty plus <br />penalty plus 8% interest for <br />8% interest for unpaid charges <br />unpaid charges certified, <br />certified. <br />$ 50.00 $ 50.00 <br />(staff permit) <br />(-t* engineering $100.00 if <br />fee if engineering fee <br />necessary) necessary)
The URL can be used to link to this page
Your browser does not support the video tag.