My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution 6345
Orono
>
Resolutions, Ordinances, Proclamations
>
Resolutions
>
Reso 0001-7499
>
Reso 6300 - 6399 June 10, 2013-April 28, 2014
>
Resolution 6345
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/23/2015 1:58:36 PM
Creation date
10/23/2015 1:58:36 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� o� <br /> � � 4 CITY of ORONO <br /> _ , <br /> a� � <br /> � �_' � RESOWTION OF THE CITY COUNCIL <br /> �'�� �� G��' No. 6 3 4 5 <br /> �kESHO�'� <br /> must be between a minimum of$3,250 and a maximum of$5,550 per residential <br /> dwelling unit. For the proposed 6 lots, the Park Fee will be based on 5 new lots. <br /> The City Assessor will be consulted to determine the final market value of <br /> the land for establishing the amount of the fee. <br /> b) Stormwater and Draina�e Trunk Fee. The development is subject to the <br /> Stormwater and Drainage Trunk Fee of $5,765 per acre x 4.89 total acres = <br /> $28,191.00. <br /> 7. Utilities. The property is within the MLTSA. Sewer and water service is available to the <br /> property in Northern Avenue. "The property was provided with municipal water in 1970 <br /> and was assessed for its entire frorrt footage but for only 3 water units. The subdivision <br /> consists of 6 total lots. The proposed subdivision will have a water connection charge <br /> due based on 3 additional units at$2,820.00 per unit=$8,460.00. <br /> The property was provided with municipal sewer in 1982 and initially assessed for 2.0 <br /> acres and 4 units. The developable acreage for this property would be calculated at 3.74 <br /> acres net of wetland and road, leaving 1.74 acres not assessed. Per the 2013 Orono Fee <br /> Schedule a sewer acreage charge is due based on $3,990 per acre x 1.74 acres = <br /> $6,943.00. Per the 2013 Orono Fee Schedule a sewer trunk unit charge is also due based <br /> on 2 additional units at$600 per unit, totaling$1200.00. <br /> 8. Existing Buildings. The developer shall rernove the existing buildings as a condition of <br /> final plat approval. Removal shall occur prior to filing of the plat with Hennepin County. <br /> 9. City Engineer Approval. Approval is subject to the recommenda.tions of the City <br /> Engineer in his comment letters dated September 9, 2013 and October 17, 2013 and any <br /> forthcoming comments as may be warranted. <br /> 10. Plans and Specifications. The following plans and specifications shall be submitted for <br /> review and approval by the City and other appropriate jurisdictions, to ensure that the <br /> proposed plat will accomplish the intended purposes: <br /> a) Final plans and specifications for all proposed utility lines and services, including <br /> proposed revisions, if any, to e�sting service facilities. <br /> b) Final grading, drainage and erosion control plan showing existing and proposed <br /> contours, building locations, elevations, stormwater facilities and calculations, <br /> utilities and erosion control measures to be used during construction. Final Plat <br /> Page 10 of 14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.