Laserfiche WebLink
r ■ <br />I,s <br />I <br />i:-' <br />b‘', <br />I'r <br />Pf- <br />»■*- <br />f <br />PI" <br />■fi <br />S'' <br />Tot Planning Commission Chairman Kelley <br />Orono Planning Commission Members <br />City Administrator Moorse <br />rroBS Michael P. Gaffron, Asst Planning & Zoning Administrator <br />Ofttas <br />SobjiK^t: <br />September 9, 1991 <br />#1683 Robert Suess, 2590 Watertown Road - <br />Preliminary Subdivision - Public Hearing <br />Soiling Dletrlct - RR-IB, single family rural residential, 2 acre, <br />unaewered <br />jlpplicn^ion ~ Request for subdivision of 19.7 acre existing <br />honeatek^i to create two 2-acre building sites <br />Lint of Bnhibita <br />Exhibit A - Application <br />Exhibit B - Plat Map <br />Exhibit C <br />Exhibit D <br />Exhibit E <br />Property Owners List <br />Survey» Proposed Plat <br />Staff Sketches: <br />1 - Existing Dedicated Road System <br />2 - Proposed Shared Driveway <br />3 - Future Cul-de-Sac (Conceptual) <br />4 — Future Connection to Golden View (Conceptual) <br />Exhibit P - Existing House Driveway Options <br />Exhibit G - 1989 Air Photo <br />Exhibit J - Pertinent Comp Plan/Subdivision Code Excerpts re: <br />Road Development <br />fnrtlnont Facta - <br />1. Total Area (Excl. Watertown Rd.)19.7 ac. <br />Propoaed <br />Outlot A : <br />Lot 1 : <br />Lot 2 t <br />Lot 3 (existing house): <br />0.6 ac. <br />2.0 ac. <br />2.0 ac. <br />15.1 ac. <br />2.Lots 1 and 2 have each been tested for drainfield <br />sites. Both lots require mound systems, and each lot <br />has a suitable building envelope to construct a single <br />family residence. The land is open and relatively <br />flat, hence the sites will need to be protected with <br />fencing during driveway/road/house construction. <br />The existing residence has u septic system that is <br />currently functional, and because Lot 3 contains 15 <br />^ ^ ^ ^ j_ _ __ _ _ _ _ _ _ _ _ _ _ _ _ _ _I —^ - a. ^ <br />W & Vtl V lA. J * iasiv» a. - F ^ ^ ^- - - -- - - -- - - - <br />acres, no alternate sites testing was required at this <br />time.