My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10-28-1991 Council Packet
Orono
>
City Council
>
1991
>
10-28-1991 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/19/2024 1:42:05 PM
Creation date
7/19/2024 1:39:53 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
247
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ORONO PUBL 1C WKS SHELL <br />PROJECT NAME:ORONO PUBUC WORKS BUILDING <br />PROJECT LOCATION:ORONO, MINNESOTA <br />PROJECT ARCHITECT:BOARMAN KROOS PFISTER 6 ASSOCIATES <br />PROJECT MANAGER:JOHN DAVIES' <br />1 J26‘00b ■ »f' ^ <br />IDATE OF ESTIMATE: <br />_ <br />OC11BER 25, 1991 <br />I8U8MITTE0 BY: KRAUS-ANOERSON CONSTRUCTION COMPANY <br />SEC.DESCRIPTION NOTES MATERIAL la^_2 _ SUBS TOTAL COST 7 <br />NO so. FT. <br />1000 Q^ERALOONOmONS $22,840 $3,000 $28,250 S54.090 2.08 <br />2100 CLEAR SITE inci 2220 '$6 ..........SO........$6 SO ~b.oo <br />2210 FOUNDATION DRAINAGE N.I.C.SO $0 'so'$6 0.00 <br />222w EXCAVATION/BACKFILL • ''SO ■ so~“$52,000 S52.dro “2.00 <br />2300PRECAST CULVERTS N.I.C.SO “so so $0 0.00 <br />2500SITE CONCRETE NIC.$0 so so $0 0.00 <br />2600ASPHALT PAVING N.I.C.SO $6 '$0 so 0.00 <br />2730STTEFeiCiNG N.I.C.so ^$0^$b so '0.00 <br />2740RETAINING WALLS NIC.$0 so*$0 $0 0.00 <br />2800LANDSCAPMG N.I.C.$d^‘■$0 .........so sb 0.00 <br />3300CAST M PLACE CONCRETE so sc $80,916 $80,918 3.11 <br />3410 PRECAST PLANK <br />— J <br />• I so so $14,270 $14.270 '0.55 <br />4220 MASONRY BIO PKG 1 <br />■ ' 1 so $0 Si 00.909 $100,909 <br />3.66 <br />4220 MASONRY ^PKG 2 1 so so $86,736 $86,736 r 3.34 <br />4400STONEWCRK -J;N.I.C.so ■ so *SO $0 '0.00 <br />5100 STRUCTURAL STEEL S2.600 so $600 S3.400 :0.13 <br />5500METAL FABRICATIONS <br />■ —i <br />S13.520 $0 $4,500 $18,020 0.69 <br />6100 ROUGH CARPENTRY I <br />1 $4,800 so $2,400' $7,200 1 6 28 <br />6200RNISH CARPENTRY ! <br />, ;S2.400 $0 $1,200 $3,600 ;3.14 <br />7115 OAlyPPROOFNG t SO so "$3,640" S3,640“^0.14 <br />7200INSULATION :incl 13120 SO so SO $0 ;0.00 <br />7531 MEMBflWE ROOFING 1 SO ■$0 $8,500i S8.500 r 0.33 <br />7620SHEET METAL $6 $0 $24,640 $24,640 1 0.95 <br />7830LOUVERS i - - -1-so ;$0 $3,800' S3,800 i 0.15 <br />7900CAUUONG :SO 'so $2,800 S2.800 ;0.11 <br />8110 HM OOORS4T1AMES ! <br />L *S3.610 $0 $1,970 S5.560 1 0.21 <br />8200WOOOOOORS SI.260 $0 $315 $1,575 i 0.06 <br />8360OVB1HEAD DOORS $0 so ,S24.087 ' $24,087 ;0.93 <br />8410 ALUM WINDOWS 6 DOORS Ezr. “$0 so $17,498 SI 7.498 0.67 <br />8710 HARDWARE S5.180 $0 $1,500 S6.680 1 0.26 <br />8850QLASSA3LAZING lincl 6410 “so so'$0 $0 0.00 <br />9250GYPSUM ORYWALL i ___ 1 SO $0 $28,340 S28.340 1 1.09 <br />9300TLEWORK SO so S9.232 S9.232 ;0 36 <br />9500ACOUSTICS.SO so'$2,250 S2.250 1 0.09 <br />9650RES. TILE/CARPET $0 $0 $2,400 S2.400 r 0.09 <br />9800FLOOR SEALER $0 $0 $18.OC''$18,000“^0.69 <br />9900PAINTING so so $14,450 $14,450 1 0.56 <br />10180 TOLET COMPARTMEI^'S500 so S250 S750 !0.03 <br />10250 FIRE EXTINGUISHERS $580 $0 $130 $710 0.03 <br />10800TOILET ACC.$600 so ■$250 $650 '0.03 <br />10900LXXaCERS N.I.C. ^SO so SO $0 1 0.00 <br />11000 GARAGE EQUIPMENT N.I.C.$0 $0 ’SO $0 6.00 <br />11200 FUeJNG EQUIPMENT N.I.C.$0 so $0 so ,0.00 <br />13120 PRE-ENG. BLOG •SO so S210.700 $210,700 ;8.10 <br />15000PLUMBING $0 $0 $47,000 $47,000 :1.81 <br />15200 UTILITIES (buiWing)•$0 $0 S21.ld0 $21.100 0.81 <br />!> <br />•r’ <br />V <br />Page <br />1^
The URL can be used to link to this page
Your browser does not support the video tag.