My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07-22-2024 CC Agenda Packet
Orono
>
City Council
>
2024
>
07-22-2024 CC Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/8/2024 3:43:35 PM
Creation date
7/19/2024 11:46:34 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
AGENDA ITEM <br />Date: July 22, 2024 <br />Title: Stormwater Improvements (24-022) <br />Presenter: DJ Goman, Public Works Superintendent <br />Section: Consent Agenda <br />Item: 4 <br />Purpose: <br />The purpose of this action item is to accept contractor quote for the improvements in Stormwater management <br />system. <br />2. Background: <br />The city has addressed areas of concern with our Stormwater flow and where and how it flows thru annual <br />inspections and maintenance including resident meetings to discuss drainage concerns. <br />3. Scope: <br />This project will provide approximately 887 feet of concrete curbing in three locations to better control water <br />run off and prevent erosion of the roadway and green space. Locations include Northern Ave from 3750 <br />going west toward the catch basin for approximately 240 feet, and at 3800 Casco Ave, for a total of 220 feet. <br />Casco Point Road from 2970 south for approximately 427 feet installed on both sides of the roadway. <br />These three locations will help effectively drain water into the existing stormwater catch basin and culverts. <br />4. Cost: <br />The City of Orono sent out over 12 requests for quotes to contractors and only received 1 quote back from <br />MEB Enterprises Inc. <br />Contractor JTotal Quote <br />MEB Enterprise Inc. $ 98,635.00 <br />Funding: <br />This project will be funded through the Stormwater Fund. The Stormwater Fund balance is projected to be $ <br />2,256,000 at the end of 2024 <br />6. Staff Recommendation: <br />I recommend the City Council accept the quote from MEB Enterprises Inc. for concrete curb installations and <br />restoration . <br />COUNCIL ACTION REQUESTED <br />26 <br />
The URL can be used to link to this page
Your browser does not support the video tag.