My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10-14-1991 Council Packet
Orono
>
City Council
>
1991
>
10-14-1991 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2024 9:46:31 AM
Creation date
7/16/2024 9:41:49 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
273
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
mmmm <br />•,vr* <br />hi <br />I <br />5^^ <br />f:'ri <br />p >• <br />u <br />I.-' <br />i <br />V \ <br />'' * 1 A ; <br />ASSOCIAI ■ i <br />D .M. ., >• <br />\ k { 'i • ' i k <br />r V !*,:»*. *>.1 <br />*r '•* •' * •'■• ' . \ <br />September 17.1991 <br />Mr. Ron Moorse <br />Cty Administrator <br />CtyofOrono <br />P.O.Box 66 <br />1335 Soutti BroMm Road <br />CrystM Bay. MN 55323 <br />ARCHITECT FEE MAXIMUM <br />Dear Mr. Moorse: <br />The attached amendment to our contract establishes the fee maximum for our hourly billings. <br />These fees are baseed on the councI approved budget costs and would fix our fee for the project <br />We wH bB against the maximum each month based on the hourly charges of the staff to <br />accomplish the work. It Is our responsiblity to complete the work within the allowable fee. This <br />establishes our fee for the current project work as defined by the current councfl on the new site. <br />We began to acttvsiy work on the project on about February 1.1991. <br />The work prior to 6idt point consisted of the initial study, which was a separate contract. The <br />current contract 'uvcived a schematic design phase on the site southwest of Highway 12 and Old <br />Crystal Bay Road which was abandcned. From the former work we can credit the city $8,000 <br />towards the currant schematic work, which b reflected In the amendment This was discussed <br />wfth Mark prior to Ms leaving with the int f^nt that the final fee be defined when it was more dear as <br />to the final project cost <br />XMatcl approval and signature. Give me a cail to discuss this for your review, <br />ippreciate this opportunity to be of service to the City of Orono. <br />Boarman Kroos Pfister A Associates, Inc. <br />Attached:Contract Amendment <br />Fie Name: OM4\b\2-JBl <br />2 2 2 Nn'-’h 2nti v • n n e .i u») I. ^ S > 4 ; 6 i 2 i j ' <br />t U ii a I * • 1/ 0 O r * u *1 l C •' i ' . 1? ' <br />*•;: f t i: : ] >u:;: <br />1^
The URL can be used to link to this page
Your browser does not support the video tag.