My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution 7490 Prel Plat Honey Hill
Orono
>
Resolutions, Ordinances, Proclamations
>
Resolutions
>
Resolution 7490 Prel Plat Honey Hill
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/29/2024 3:04:08 PM
Creation date
7/10/2024 8:35:01 AM
Metadata
Fields
Template:
Address
House Number
3465
Street Name
6th
Street Type
Avenue
Street Direction
North
Address
3515 6th Avenue North
Document Type
Resolutions
Permit Number
LA24-000030
PIN
2911823430011
2911823430002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Resol. 7490 <br /> Exhibit C BOLTON <br /> 2E LA24-000030 t1Suite LUU <br /> Chask <br /> & M E N K a, MN 55318-1172 <br /> Real People.Real Solutions. Ph: (952) 448-8838 <br /> Fax: (952) 448-8805 <br /> Bolton-Menk.com <br /> June 19,2024 <br /> City of Orono <br /> Attn:Adam Edwards <br /> 2750 Kelley Parkway <br /> Orono,MN 55356 <br /> RE: Preliminary Plat Application <br /> Honey Hill <br /> Engineering Review#2 <br /> Dear Adam: <br /> As requested,I have completed an engineering review of the Stormwater Management Plan and Master <br /> Grading Plan submitted for the above referenced project. Following are my comments for your <br /> consideration: <br /> 1. The applicant is proposing four infiltration basins to meet stormwater runoff management <br /> requirements. The following should be considered regarding the proposed system: <br /> a. Proposed infiltration basins provide 1.2' depth for Basin 1, 1.5' for Basins 2 and 3,and 3.0' <br /> for Basin 4. The NPDES permit requires a drawdown of surface water within 48 hours for <br /> infiltration basins.Based on site soils, a maximum depth of 0.8' is allowable to meet this <br /> requirement. Basins must be revised to provide the maximum allowable depth accordingly <br /> or the design should be revised to include draintile and be considered filtration. <br /> b. A minimum 8' wide access bench must be provided around all basins to allow for future <br /> maintenance. <br /> c. A minimum 1' separation should be provided between the surface overflows and top of <br /> adjacent berms. <br /> d. Proposed basins should be installed with street construction to ensure they are constructed <br /> as intended. <br /> e. Proposed basins should be vegetated with a native stormwater seed mix. <br /> 2. Consideration should be given to installing RCP for the 12"culvert proposed at approximately <br /> station 3+11 in lieu of CMP to provide a longer lifecycle material. <br /> If you have any questions or comments,please contact me to discuss. <br /> Sincerely, <br /> Bolton & Menk, Inc. <br /> 6-4 <br /> Robert E. Bean,Jr.,P.E. <br /> Senior Water Resources Project Manager <br /> H:\ORNO\_Surface Water Management\MS4 Administration\MCM-5\2_Site Plan Reviews\Honey Hill\Honey Hill_PrePlatReview-2 2024-06-19.docx <br /> Bolton&Menk is an equal opportunity employer. <br />
The URL can be used to link to this page
Your browser does not support the video tag.