My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-09-1991 Council Packet
Orono
>
City Council
>
1991
>
09-09-1991 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2024 2:27:25 PM
Creation date
7/9/2024 2:24:48 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
290
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
f- <br />L <br />iK' <br />To:Jeanne A. Mabusth, Buildinq & Zoninq Administrator <br />Steve Weckman, Septic Inspector <br />Date:August 8, 1991 <br />Subject: Mark Johnson Subdivision, 4455 Eayside Pcad, Pev^^w of <br />Septic System Information <br />A, Proposed Lot 1 <br />The existing house on proposed Lot 1 has a septic system <br />that is failing as noted on the recent inspection. The system <br />consists of one concrete tank of unknown size, two trenches of <br />approximately 75* in length and an overflow tile that outlets <br />into the wetland to the south of this property. Since this <br />has a failing septic system, primary and alternate drainfre’' <br />sites have been identified. These sitejj will be used in the <br />event that the existing system cannot be repaired satisfactorily <br />The following repairs will be made to the existing septic <br />system as soon as weather permits. Sections of drainfield tile <br />that have been crushed will be replaced as well as any rock that <br />was displaced during the excavation. The overflow pipe leading <br />from the distribution box will be cemented shut and a section of <br />that pipe approximate! 10* away from the distribution box will <br />be removed where the pipe will be plugged again to assure that <br />septic effluent does not use the abandoned pipe as a conduit. <br />Missing baffles from the septic tank will be replaced as well. <br />B Proposed Lot 2 <br />Soil testing and design have been completed for proposed Lot <br />2. The results Indicate that the lot is suitable for both <br />primary and alternate mound-type drainfield sites adequate to <br />serve a 4-bedroom home. The sites do have sufficient drainfield <br />area for larger than a 4-bedroom home if necessary. These sites <br />SMy be used at the time a home is built on the lot. <br />cc: Michael P. Gaffron, Asst Planning fc Zoning Administrator <br />Isv
The URL can be used to link to this page
Your browser does not support the video tag.