My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07-08-2024 CC Agenda Packet
Orono
>
City Council
>
2024
>
07-08-2024 CC Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/8/2024 12:16:15 PM
Creation date
7/8/2024 12:08:54 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
213
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />CITY OF ORONO <br />RESOLUTION OF THE CITY COUNCIL <br /> <br />NO. 7487 <br /> <br /> <br />2 <br /> <br />A3. The Property contains approximately 22 acres in area. <br /> <br />A4. The Applicants have applied for an IUP for grading. <br /> <br />A5. In considering this application for an IUP, the Council has considered the advice and <br />recommendation of the Planning Commission and the effect of the proposed IUP upon <br />the health, safety and welfare of the community, existing and anticipated traffic <br />conditions, light and air, danger of fire, risk to the public safety, and the effect on values <br />of property in the surrounding area. <br /> <br />INTERIM USE PERMIT ANALYSIS: <br /> <br />The Council has determined that the proposed use will comply with the following IUP criteria <br />outlined in Code Section 78-1726: <br /> <br />B1. The use is allowed as an interim use in the applicable zoning district; Grading <br />activities are permitted within the LR-1A Zoning District. This criterion is met. <br /> <br />B2. The use will not delay anticipated development or redevelopment of the site; The <br />grading activities will not impact future site development. This criterion is met. <br /> <br />B3. The use will not be in conflict with any provisions of the city code on an ongoing <br />basis; The plan will be reviewed by our City Engineer and the Applicants will be <br />required to follow City requirements. The project will obtain all necessary <br />permits with outside agencies including MCWD, LMCD, and NPDES permitting. <br />This criterion is met. <br /> <br />B4. The use will not adversely affect the adjacent property, the surrounding <br />neighborhood, or other uses on the property where the use will be located; The <br />Applicants shall ensure the project scope remains within the property lines, <br />the haul route is monitored (and cleaned as often as necessary), and that any <br />adverse impacts are mitigated. This criterion is met. <br /> <br />B5. The use will not impose additional unreasonable costs on the public; The project will <br />not impose additional costs on the public. This criterion is met. <br /> <br />B6. The date or event that will terminate the use can be identified with certainty; The <br />Applicants have provided a project timeline which will commence in the Fall of <br />2024 and will be finalized mid-summer 2025. This criterion is met. <br />69
The URL can be used to link to this page
Your browser does not support the video tag.