My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07-08-2024 CC Agenda Packet
Orono
>
City Council
>
2024
>
07-08-2024 CC Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/8/2024 12:16:15 PM
Creation date
7/8/2024 12:08:54 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
213
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Date: July 8, 2024 Item: 21 <br />Presenter: Adam Edwards, City Administrator / Engineer <br />Section: City Administrator/Engineer Report <br /> <br />Title: Street Improvement Project Planning and Engineering (Project #25-001) <br /> <br /> <br />1.Purpose: <br />The purpose of this action item is to gain council approval to commence the planning and engineering of the <br />2025 Street Improvement Project. <br />2.Background: <br />At the May 13, 2024 Council Work Session, the Council provided direction for 2025 street projects. The <br />streets being considered for 2025 are: <br /> a. Kelly Avenue- Full reconstruction with watermain replacement <br /> b. Lydiard Avenue, & Lydiard Circle Mill and Overlay and Stormwater improvement <br /> c. Carmen Road- Mill and overlay and add concrete curb and gutter <br /> d. Ferndale Road West - Pavement reclaim and replace culvert <br /> e. Dahl Road (as an Alternate) - Pavement reclaim and add concrete curb and gutter <br /> f. Wildhurst Trail (Corner to Cul-de-sac) (As an Alternate) - Mill and overlay. <br />3.Scope: <br />a. Planning and engineering will consist of topographic surveying, utility inspections, design, permitting, <br />public input and solicitation of bids for select roads. <br />4.Cost: <br /> a. Bolton and Menk has provided a scope of services for a fee estimate not to exceed $281,000 (Exhibit A). <br /> b. The preliminary cost estimate for the project is $3,283,100. <br />5.Funding: <br />The engineering as well as the eventual projects will be funded with a combination of the Pavement <br />Management and Stormwater Fund. <br />Fund Cost Estimate Est. 2024 End of <br />Year Fund Balance <br />Pavement Fund $ 1,517,400 $ 722,778 <br />Stormwater Fund $ 272,100 $ 2,256,606 <br />Water Fund $ 1,458,300 $ 1,262,509 <br />Sewer Fund $ 35,300 $ 671,171 <br />Total $3,283,100 <br />6.Staff Recommendation: <br />I recommend Council authorize the design of the 2025 street project. <br />AGENDA ITEM <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />COUNCIL ACTION REQUESTED <br />Move to direct the City Engineer to move forward with preliminary planning for the 2025 Street maintenance <br />project and acceptance of the Bolton and Menk’s proposal for design. <br />207
The URL can be used to link to this page
Your browser does not support the video tag.