My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07-22-1991 Council Packet
Orono
>
City Council
>
1991
>
07-22-1991 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/1/2024 10:57:49 AM
Creation date
7/1/2024 10:53:54 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
405
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
W'rr-i-. <br />t <br />h <br />!&■ <br />I* -V <br />r('^ ' <br />m <br />•ft': <br />k'^ <br />.a- <br />t <br />m <br />i^' <br />i; <br />r <br />CITY OF ORONO APPLICATION FOR DEMOLITION PERMITP.O. Box 66 (1335 So Brovm Rd)Crystal Bay» MN 55323 <br />SPECIAL CONDITIONS & HOLD HARMLESS AGREEMENT <br />Gaaaral Instmctlons ^ ^ ^1. You may be required to obtain other permits» i.e. burning^ well <br />2a Work nu8^ not be9in unless the permit card is available on the 30 <br />site a <br />3. A 24 hour notice is required for all inspections. C^^i.^^^“31*Il****** <br />JOB 8ITB ADDRESS: <br />Occupancy Type:Residential <br />■S NAME: <br />Commercial <br />Phone: <br />Mailing Address:City: <br />GOHTRACTQR'S NAME:Bus. No.: <br />Mailing Address: _ _ _ _ _ _ _ _ _ _ _ _ _ _ <br />Demolition if planned by means of:manual disassembly _heavy equipment <br />burning (by fire department) <br />Permits Issued: <br /># Burning Fire Department <br /># Well Abandonment <br />In return for issuance of said Demolition Permit, the undersigned owner <br />hereby agrees as follows: <br />1.The structure(s) shall be kept enclosed and/or secured until such time <br />as demolition is complete. <br />2.Demolition debris will be kept off adjoining property and/or the <br />public rights-of-way unless specific prior approval is obtained in <br />writing for temporary use thereof . <br />3. <br />4. <br />Foundations shall be completely removed from the ground. <br />All demolition debris shall be completely disposed of off site in <br />accordance with all appl cable PCA requirements. <br />5.Water wells must be abandoned in accordance with State Health <br />Department regulations. <br />6.Inspection required when all debris l.as been removed, before <br />backfilling. <br />7.Within 5 working days of superstructure removal, a final inspection <br />shall be requested. The site shall be left clean and clear of all <br />debris, with any excavation filled with earth level with the adjacent <br />ground «^levatlon (except when such excavation is to be used as ^rt or <br />a new building and such new building is actually under construction).
The URL can be used to link to this page
Your browser does not support the video tag.