Laserfiche WebLink
w> <br />1^'" •• <br />OOM. <br />•n <br />•M <br />tM <br />n>- Iff?05/M/91 <br />06/2S/91 <br />■fO <br />*n <br />-ISM <br />-MO Cb^Kfciva (Pdorlty) <br />1 mar mi - 3o mkl m2 <br />m OQU. AREA OUBCnVB OATES srans <br />1. <br />'» wo (C)A.Rlgtway 12 <br />1.OtilitiM <br />Sauer ~ Pert li Detennim Route <br />Order Plans and Specs <br />Bid <br />Construct <br />09/01/91 <br />09/01/91 <br />10A5/91 <br />Hiter Systfli Installaticn 4/91-7/91 <br />Main well operational 5/21/91 <br />6/91 Sultci) cwerintcrln uell to Ottcn <br />ttawr (9-12 sontte) <br />08/01/91 <br />Authorized aweitlng locetlon dedsicsi <br />Order Asseswwits (Sewer Pt II Plus Wall a Tower) <br />Nsgotlatlcn on Dtilities <br />(Long Uke - Hadlna) <br />Ootnenoed water discusslcn 10/25/89 <br />with Medina - Medina to Met with affected <br />residents 1/90 to dianias <br />(Potoitial new subdivision in Medina nay <br />have an iqpsct on project.) <br />. . . . .mm